Laserfiche WebLink
Partnership (CTP) program to Program <br />improve flood models and (potential), <br />channel migration zone FCZD Levy <br />WNC. <br />Increase flood conveyance, <br />eliminate canal / creek <br />Whisky Creek at <br />intermingling, and address fish FCZD Levy, <br />Ellensburg Water <br />passage barrier by replacing Grant or partner 2028 TBD <br />Company (EWC) <br />current EWC crossing at support for <br />Siphon <br />Whiskey Creek with a siphon. construction <br />Kittitas County Conservation <br />District (KCCD) managed <br />project, with FCZD cost -share. <br />Table 1 continued - Six -Year Plan Summary <br />2024.2029 Summary Kittitas County Public Facility Projects <br />Proiect Name <br />Location & Description Funding Source Schedule Total Cost <br />WNC. <br />Hydrologic analysis with <br />existing 2-dimensional model to <br />evaluate Whiskey Creek tie-in <br />at Reecer Creek project. <br />Wilson-Naneum- <br />Evaluate effects of Mercer <br />Cherry — Phase 2 <br />Creek flow routing north of the <br />FCZD Levy <br />2023 <br />$100,000 <br />Whisky Reroute <br />airport on hydrologic regime, <br />Feasibility Study <br />design specification needed at <br />proposed railroad crossing, and <br />within Reecer Creek floodplain <br />site, and water needs <br />downstream of proposed <br />reroute site <br />FCZD Levy, <br />Wilson-Naneum- <br />WNC. <br />Flood Control <br />Cherry — Phase 3 <br />Implement capital <br />Assistance <br />2025-2027 <br />$600,000 <br />Whisky Reroute <br />recommendations from Phase 2 <br />Account <br />Design <br />Feasibility Study <br />Program <br />FCZD Levy, <br />WNC' <br />Ecology <br />Flow Conveyance <br />Implementation of project <br />similar to Mercer at Helena <br />Centennial <br />2023-2024 <br />$360,000 <br />Restoration— Site 2 <br />flow conveyance project, site <br />Clean Water <br />TBD <br />grant <br />(potential) <br />FCZD Levy, <br />TBD. Implementation of project <br />Ecology <br />Flow Conveyance <br />similar to Mercer at Helena <br />Centennial <br />2025-2026 <br />$392,000 <br />Restoration — Site 3 <br />flow conveyance project, site <br />Clean Water <br />TBD <br />grant <br />Crystal Creek. <br />Crystal Creek Implement project identified Grant funding 2023-2024 $120,000 <br />Conveyance Project through Crystal Creek CTP TBD <br />2024-2029 Summary Page 21 <br />