My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-2029 Six Year CIP Packet for Hearing Request
>
Meetings
>
2023
>
12. December
>
2023-12-05 10:00 AM - Commissioners' Agenda
>
2024-2029 Six Year CIP Packet for Hearing Request
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2023 12:42:38 PM
Creation date
11/30/2023 12:20:37 PM
Metadata
Fields
Template:
Meeting
Date
12/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Set a Public Hearing to consider Adoption of the Capital Improvement Program for the Planning Period 2024-2029
Order
14
Placement
Consent Agenda
Row ID
111743
Type
Hearing notice
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. Flood Control Zone District <br />Project Name <br />Location & Description <br />Funding Source <br />Schedule <br />Total Cost <br />Flood Control <br />Flood Hazard Risk <br />Yakima River. Comprehensive <br />Zone District <br />and Repetitive Loss <br />Flood Planning and Repetitive <br />(FCZD) Levy, <br />2023-2027 <br />$230,000 <br />Program <br />Loss Hazard Assessment <br />future phases <br />by grant <br />Flood Control <br />Assistance <br />Collect necessary data, conduct <br />Account <br />Repetitive Loss: <br />a flood hazard analysis, and <br />Program <br />Easton Reach Flood <br />Study <br />engage the local community to <br />develop a reach -level plan <br />(FCAAP), <br />FCZD Levy. <br />OM4 2023 <br />$80,000 <br />informed by natural processes. <br />Future phases <br />will be grant <br />eli ible'C <br />. <br />Table 1 continued - Six-Yeai`Plan`Summary.', <br />2024.2029 Summary Kittitas,C� un Public FacilityProjects <br />j Pro ect Name <br />Location & Descri tion <br />Fundin Source <br />Schedule <br />Total Cost <br />'Yakima Basin's <br />Integrated Plan, <br />FCZD Levy, <br />United States. <br />s <br />Bureau of <br />Ringer Reach. ""Reclamation <br />Ringer Loop Property <br />Control for invasive species, <br />' (USBR) In, <br />riparian buffer plantings, and <br />Kind Services, <br />2023-2026 <br />$800,000 <br />Improvements <br />building decommissioning at <br />Mid -Columbia <br />Ct a ty-oedproperties. <br />Fisheries <br />Enhancement <br />Group <br />(MCFEG) In- <br />Kind Services, <br />rant fundirw <br />x <br />m Rger Reach. <br />Yakima River <br />Basin <br />Implementation of preferred <br />Integrated Plan <br />Hanson Levee'and <br />alternative from`Hanson Pits <br />(potential) <br />Private Berms <br />Restoration Plan and Design. <br />, <br />Salmon <br />2023-2026 <br />$1,265,000 <br />Removal <br />2023 SRFB (Salmon Recovery <br />Recovery <br />Funding Board) design only <br />Funding Board <br />grant.` <br />r„ <br />otential <br />.Flood Control Zone District <br />Reecer Creek <br />Cost share in support of City of <br />Dolarway to <br />Ellensburg Project to purchase <br />FCZD Levy <br />2023 <br />$850,000 <br />University <br />property, construct setback <br />levees and construct second <br />bridge along Dolarway Rd. <br />Stream Gauging and <br />2023 site additions: Wilson <br />Early Warning <br />Creek, Reecer Creek, Crystal <br />FCZD Levy <br />2023-2027 <br />$250,000 <br />System <br />Creek <br />Cooperating <br />General. <br />Community <br />Technical Partners <br />Continued funding through <br />Technical <br />2023-2027 <br />$650,000 <br />CTP Flood Studies <br />FEMA's Cooperating Technical <br />Partnership <br />2024.2029 Summary <br />Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.