Laserfiche WebLink
-.o, n,� CRP/RC #: <br />�14:Reecer Creek Rd Bridge <br />K _. <br />Location: MP 0.86 Reecer Creek Rd/Towne Ditch <br />�r Last Updated: 8/14/2023 Replacement 16 <br />Project Number: RC2295-BR Length: 0.01 mile <br />Basis for Project: Bridge replacement Construction: 2027 <br />Project Description: <br />Bridge #88212 on Reecer Creek Road over the Towne Ditch. Replace existing single span, structuraLLy deficient Load posted <br />concrete bridge with a longer, single span, prestressed concrete girder structure to meet current design standards and to Im- <br />prove the hydraulic opening. <br />Status: Design and Right of Way phases 2026 with construction in 2027 <br />Traffic Impacts: To be determined with design. <br />Funding Sources: <br />LocaL Bridge $2,734,000 <br />Program <br />Total: $2,734,000 <br />For more Inlorrrudon on sins proien. mnmd Pudllc. works aS 5U9.962.75Z3 or pub Ltc rkgPzoA1Mtw.wm.w <br />Frequently Asked Questions Page 142 <br />