CRP/RC #: <br />Location: Various <br />Last Updated: 8/14/2023 <br />Short Span Bridge Replacement- <br />Phase 1 <br />15 <br />Project Number: Length: TBD <br />Basis for Project: Safet Construction: 2026 <br />Project Description: <br />Kittitas County has 156 routinely inspected structures having a length under 20-feet. These structures are not eligible for the WSDOT <br />Bridge Replacement Advisory Committee (BRAG) funding, as such it Is the County's responsibility to maintain or replace these structures <br />with County funds. Based on field reviews many of these structures need significant repairs or to be replaced. This phase begins to ad- <br />dress the need to repair or replace these structures. Multiple phases will be required to address all structures. <br />Status: Planned. Planned for design in 2025 and construction in 2026. <br />Traffic Impacts: TBD <br />Funding Source: <br />Planned STBG $2,724,000 <br />Localfunding $426,000 <br />Total: $3.150.000 <br />Brickmill Rd east of Naneum Rd Hungry Junctlon Rd east of Reecer LreeK Hd <br />Tor more information on this proiect, contact Wblic Works at_509-962JS2B or public rks@co.kittitas.wa.us <br />Frequently Asked Questions Page 141 <br />