Laserfiche WebLink
CRP/RC #: 316-22 Faust Rd Bridge <br />Resolution #: 2022-155 <br />Location: MP 0.59 Faust Rd, Towne Ditch Replacement 5 <br />Last Updated: 8/10/2023 <br />Project Number: RC2195-BR Length: 0.01 mile <br />Basis for Protect: Bridge replacement Construction: 2024 <br />Project Description: <br />Bridge #88212 on Faust Road over the Towne Ditch Is currently load restricted. The project will replace existing single span, <br />structurally deficient, load posted concrete bridge with a longer, single span, prestressed concrete girder structure to meet <br />current design standards and to improve the hydraulic opening. <br />Status: Design and Right of Way phases 2022-2023, with construction in 2024 <br />Traffic Impacts: To be determined with design. <br />0�1 <br />Funding Sources: <br />Local Bridge Pro- $2,017.000 <br />gram <br />Funds applied in $514,000 <br />2023 <br />Total: $2,531,000 <br />For pra)ect- <umac[ F'vb1. works ri 509-9Q-7523 <br />Frequently Asked Questions <br />Page 131 <br />