My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-2029 Six Year CIP Packet for Hearing Request
>
Meetings
>
2023
>
12. December
>
2023-12-05 10:00 AM - Commissioners' Agenda
>
2024-2029 Six Year CIP Packet for Hearing Request
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2023 12:42:38 PM
Creation date
11/30/2023 12:20:37 PM
Metadata
Fields
Template:
Meeting
Date
12/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Set a Public Hearing to consider Adoption of the Capital Improvement Program for the Planning Period 2024-2029
Order
14
Placement
Consent Agenda
Row ID
111743
Type
Hearing notice
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRP/RC #: 315-22 Cooke Canyon Rd Bridge <br />Resolution #: 2022-156 <br />Location: MP 0.24 Cooke Canyon Rd Replacement <br />Last Updated: 8/10/2023 4 <br />Project Number: RC2194-BR Length: 0.01 mile <br />Basis for Project: Bridge replacement Construction: 2024 <br />Project Description: <br />Bridge #80181 on Cooke Canyon Road at MP 0.24 over the Hiline Canal is currently load restricted and structurally deficient. <br />This project will replace existing single span, structurally deficient, load posted concrete bridge with a longer, single span, <br />prestressed concrete girder structure to meet current design standards and to Improve the hydraulic opening. <br />Status: Design and Right of Way phases 2023, with construction in 2024 <br />Traffic Impacts: To be determined with design. <br />Funding Sources: <br />Local Bridge <br />Program <br />Funds applied <br />in 2023 <br />Total: <br />t <br />$2,161,000 R <br />Nkz <br />$562.000 <br />$2,723,000 — <br />Cooke Canyon Rd Looking north <br />Eroding concrete girder <br />For mort mformmoon on this prgcel, coMag YubNS Works ii 509 5.5 k,7573 orputW—OAw aCo. kirmes."An <br />Frequently Asked Questions Page 130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.