Laserfiche WebLink
CRP/RC #: 315-22 Cooke Canyon Rd Bridge <br />Resolution #: 2022-156 <br />Location: MP 0.24 Cooke Canyon Rd Replacement <br />Last Updated: 8/10/2023 4 <br />Project Number: RC2194-BR Length: 0.01 mile <br />Basis for Project: Bridge replacement Construction: 2024 <br />Project Description: <br />Bridge #80181 on Cooke Canyon Road at MP 0.24 over the Hiline Canal is currently load restricted and structurally deficient. <br />This project will replace existing single span, structurally deficient, load posted concrete bridge with a longer, single span, <br />prestressed concrete girder structure to meet current design standards and to Improve the hydraulic opening. <br />Status: Design and Right of Way phases 2023, with construction in 2024 <br />Traffic Impacts: To be determined with design. <br />Funding Sources: <br />Local Bridge <br />Program <br />Funds applied <br />in 2023 <br />Total: <br />t <br />$2,161,000 R <br />Nkz <br />$562.000 <br />$2,723,000 — <br />Cooke Canyon Rd Looking north <br />Eroding concrete girder <br />For mort mformmoon on this prgcel, coMag YubNS Works ii 509 5.5 k,7573 orputW—OAw aCo. kirmes."An <br />Frequently Asked Questions Page 130 <br />