Laserfiche WebLink
<br />2024-2029 Summary Page 7 <br /> <br />Block Grant <br />(STBG) <br />Airport Road <br />Sidewalk <br />Replacement <br />MP 1.35-1.85, Bowers Road, <br />Ellensburg <br />Improvements and increased <br />drainage <br />Local funds 2023 $78,000 <br />Progress Path – Ph. 2, <br />Cle Elum to Roslyn <br />Cle Elum to Roslyn, Develop a <br />paved path from existing. <br />Safe Routes to <br />School, Local <br />Funds <br />2023-2024 $410,000 <br />HSIP 2023-2025 <br />Awarded Project Various, TBD HSIP, Local <br />Funds 2024-2025 $1,150,000 <br />Badger Pocket Area <br />Road Improvements, <br />Payne Rd, Phase 1 <br />MP 0.0 – MP 1.55, <br />Safety, rehabilitation, and <br />improvements <br />Local Funds 2024-2025 $3,700,000 <br />Yellowstone Rd <br />Culvert Replacement <br />MP 0.65 – MP 0.75 Snoqualmie <br />Pass, Culvert Replacement Local Funds 2024-2025 $1,755,000 <br />Denmark Road <br />Improvement <br />MP 3.08-4.35 <br />Safety, bridge replacement, and <br />other improvements <br />RAP, Local <br />Funds 2025-2027 $4,610,000 <br />Badger Pocket Area <br />Road Improvements, <br />Phase 2 <br />Various. <br />Safety, rehabilitation, and <br />improvements <br />Local Funds 2025-2026 $2,780,000 <br />Airport Road Culvert <br />Replacement <br />MP 2.25-2.4, Cle Elum <br />Drainage improvement and <br />flood reduction <br />Local Funds 2026-2027 $1,290,000 <br />Short Span Bridge <br />Replacement, Phase 1 <br />Snoqualmie Pass <br />Safety <br />Planned STBG, <br />Local Funds 2025-2026 $1,400,000 <br />Badger Pocket Road <br />HMA <br />MP 0.0-0.57, Ellensburg <br />Rehabilitation and maintenance Local Funds 2025-2026 $1,640,000 <br />Table 1 continued - Six-Year Plan Summary <br />2024-2029 Summary Kittitas County Public Facility Projects <br />Project Name Location & Description Funding Source Schedule Total Cost <br />HSIP 2025-2027 <br />Awarded Project <br />Various, TBD <br />Safety <br />HSIP, Local <br />Funds 2026-2027 $450,000 <br />Reecer Creek Rd <br />Bridge Replacement <br />MP 0.86 Reecer Creek <br />Road/Town Ditch <br />Bridge replacement <br />Local Bridge <br />Program, Local <br />Funds <br />2026-2027 $2,734,000 <br />Lambert Road Bridge <br />Maintenance <br />MP 0.67 over Teanaway River <br />Maintenance and repairs <br />Planned Base <br />Realignment <br />And Closure <br />(BRAC) Funds, <br />Local Funds <br />2027-2028 $479,000 <br />Bender Road <br />Widening and <br />Pedestrian <br />Improvements <br />MP 0.0-MP 0.68, New <br />construction and improvements <br />RAP, Local <br />Funding 2027-2028 $2,300,000 <br />Sanders Road <br />Improvements <br />MP 0.13 to MP 0.25 <br />Safety, stormwater drainage, <br />roadway improvement <br />Local Funds 2028 $500,000 <br />Parke Creek Road <br />Turnaround <br />Improvement <br />MP 5.79 - 11.64, Parke Creek <br />Road, Ellensburg <br />Improvements and increased <br />drainage <br />Local Funds 2023-2024 $1,100,000