<br />2024-2029 Summary Page 8 <br /> <br />Pheasant Lane <br />Turnaround <br />MP 0.0 - 2.04, Pheasant Lane, <br />Ellensburg <br />Road and access improvements <br />Local Funds 2027-2028 $700,000 <br />Bar 14 Turnaround <br />MP 1.11 - 1.21 Bar 14 Road, <br />Ellensburg <br />Repair flood damage and school <br />bus turnaround <br />Local Funds 2023-2024 $200,000 <br />Gravel Road <br />Upgrades Various Local Funds 2023-2028 $4,650,000 <br />