<br />Frequently Asked Questions Page 177 <br /> <br />Funding <br /> <br /> <br />Basis for Project: Crystal Creek Flood Study Schedule: 2029 <br />Project Description: <br />Implement Crystal Creek conveyance project identified through 2019 Crystal Creek flood study. Site to be determined. Design <br />and permitting scheduled for 2029. <br /> <br /> <br /> <br /> <br /> <br />Status: Planned project <br /> Flood Impacts: Decreased flooding along Crystal Creek. <br /> <br /> <br /> <br /> <br /> <br />Project Name: #16 Crystal Creek Conveyance Project <br />Crystal Creek Flood Study <br />Last Updated: July 25, 2023