Laserfiche WebLink
<br />Frequently Asked Questions Page 176 <br /> <br />Funding <br />FCZD Levy <br />Ecology Centennial Clean <br /> <br /> <br />Basis for Project: Recurring need Schedule: 2027—2029 <br /> <br />Project Description: <br />Implement flow conveyance restoration project that exceeds scope of annual flow conveyance maintenance activities. Typically <br />these project require the removal of crack willow and associated sediment accumulations. Site to be determined. <br /> <br /> <br /> <br /> <br /> <br />Status: Planned project <br /> Flood Impacts: Decreased flood frequency. <br /> <br /> <br /> <br /> <br /> <br />Project Name: #15 Flow Conveyance Restoration (Site 3) <br />Based on need <br />Last Updated: July 25, 2023