Laserfiche WebLink
4.) Labor Day Holiday each year (2024-2026), Thursday through Tuesday <br />5.) Optional winter shut down at the contractor's discretion. Assumed shut down dates - November 151h_ <br />March 15th <br />Holiday Opening Section: <br />T% <br />Optional Winter Shut Down Section: <br />HLD <br />Traffic will return to two lanes in each direction with 55 mph continuous work zone speed limit due to <br />vertical transition on the bridge. <br />1.z sr� <br />SECTION A <br />s' SHLD <br />Traffic and freight will be warned of delay in advance of the project using dynamic messaging / ITS signs <br />beginning in Cle Elum on the west side and George and Ritzville on the east side. <br />