Laserfiche WebLink
placement of traffic control devices to increase driver expectancy and improve driver comprehension of how <br />they can safely and efficiently navigate through the construction work zone. <br />Traffic Lane Configurations: One lane will be maintained in each direction with no physical separation through <br />the work zone across the bridge. Lane widths will be reduced to 11 feet with 1-foot shoulders. Lane with <br />reductions and merging to one lane will occur on 1-90 east and west of the work zone. <br />There will be three alternating lane configurations throughout the duration of the deck replacement work. <br />1) Live traffic in existing westbound lanes. <br />2) Live traffic in existing eastbound lanes. <br />29' <br />WORX ZONE <br />Y' <br />WESTBOUND CLOSED <br />ill 3. I% 71' <br />h' 1 -+-1 h+ 1' SSHLR <br />3.) Live traffic in split (one lane in each direction) condition with a median closure. <br />22' y y <br />WORX ZONE •r <br />3. <br />CENTER CLOSED <br />While the construction is in progress, speeds will be reduced through the work zone from 70 MPH to 40 MPH <br />for the eastbound direction and from 70 MPH to 55 MPH or 40 MPH for the westbound direction, dependent <br />upon queue length. <br />Construction will be shut down/ suspended during these periods: <br />1.) Memorial Day Holiday each year (2024-2026), from Friday through Tuesday. <br />2.) July Fourth Holiday each year (2024-2026) one week suspension. <br />3.) Watershed Weekend each year (2024-2026), from the Thursday prior to the Monday after. <br />