|
DCW Cost Management
<br />City of Ellensburg
<br />Unity Park
<br />50% Construction Docunrents Cost Plan May 2,2023 B
<br />New Construction
<br />IotalQuantity Unit Rate
<br />ControlQuanttlm
<br />Program Areas
<br />ROW
<br />Asphalt - alley
<br />Unit ptrvers
<br />Concrete
<br />Pedestrian Paving
<br />Concrele, vehicular rated
<br />Unft pavers, brick
<br />Site Development
<br />Concrete stage
<br />Concreic sta/rs
<br />Concrete rarnp
<br />V/ater feature
<br />Cornfort Station - building
<br />Landscape
<br />Planting area
<br />Lavttn
<br />Gravel - dog areas
<br />22,811
<br />1,090
<br />485
<br />445
<br />160
<br />14,050
<br />12,971
<br />1,073
<br />2,534
<br />1,116
<br />aq
<br />208
<br />365
<br />75A
<br />5,137
<br />1 ,917
<br />3,130
<br />90
<br />ctr
<br />5r
<br />SF
<br />SF
<br />JT
<br />JT
<br />SF
<br />SF
<br />SF
<br />L-a
<br />-\l
<br />sF
<br />SF
<br />SF
<br />SF
<br />SF
<br />SF
<br />SF
<br />G10 Site Preparation 22,811 SF 11.93 272,193
<br />G10'1 0 Site Clearing
<br />SPCC Plan
<br />Construction fence
<br />Street cleaning
<br />Temporary toilets
<br />Construction entrance
<br />Trafflc conirol - part time
<br />Erosion control
<br />Tree protection - fencing
<br />Utility protection
<br />Construction survey, incl. layout
<br />G1020 Site Demoliiion and Relocations
<br />Demo - building
<br />Demo - canopy, drive-through
<br />Demo - concrete, incl. subgrade materials
<br />Demo - asphalt, incl. subgrade materials
<br />Demo - sawcut
<br />Demo - curb
<br />Demo - planters
<br />B2O SF
<br />1,305 SF
<br />6,280 SF
<br />11,140 SF
<br />712 LF
<br />1,1 15 LF
<br />3,890 SF
<br />18.50
<br />12.50
<br />2.25
<br />2.50
<br />7.5A
<br />9.00
<br />0.75
<br />15,170
<br />16,31 3
<br />14,130
<br />27,850
<br />5,340
<br />10,035
<br />2,918
<br />4
<br />22,8
<br />1
<br />75
<br />6
<br />6
<br />1
<br />6
<br />11
<br />EA
<br />LF
<br />MO
<br />MO
<br />EA
<br />MO
<br />SF
<br />LS
<br />LS
<br />2,500.00
<br />13.00
<br />'1,500.00
<br />900.00
<br />5,500.00
<br />1,200.00
<br />0.17
<br />9,500.00
<br />25,000.00
<br />2,500
<br />6,'t 75
<br />9,000
<br />5,400
<br />5,500
<br />7,200
<br />3,878
<br />,V/U
<br />9,500
<br />25,000
|