Laserfiche WebLink
DCW Cost Management <br />City of Ellensburg <br />Unity Park <br />50% Construction Docunrents Cost Plan May 2,2023 B <br />New Construction <br />IotalQuantity Unit Rate <br />ControlQuanttlm <br />Program Areas <br />ROW <br />Asphalt - alley <br />Unit ptrvers <br />Concrete <br />Pedestrian Paving <br />Concrele, vehicular rated <br />Unft pavers, brick <br />Site Development <br />Concrete stage <br />Concreic sta/rs <br />Concrete rarnp <br />V/ater feature <br />Cornfort Station - building <br />Landscape <br />Planting area <br />Lavttn <br />Gravel - dog areas <br />22,811 <br />1,090 <br />485 <br />445 <br />160 <br />14,050 <br />12,971 <br />1,073 <br />2,534 <br />1,116 <br />aq <br />208 <br />365 <br />75A <br />5,137 <br />1 ,917 <br />3,130 <br />90 <br />ctr <br />5r <br />SF <br />SF <br />JT <br />JT <br />SF <br />SF <br />SF <br />L-a <br />-\l <br />sF <br />SF <br />SF <br />SF <br />SF <br />SF <br />SF <br />G10 Site Preparation 22,811 SF 11.93 272,193 <br />G10'1 0 Site Clearing <br />SPCC Plan <br />Construction fence <br />Street cleaning <br />Temporary toilets <br />Construction entrance <br />Trafflc conirol - part time <br />Erosion control <br />Tree protection - fencing <br />Utility protection <br />Construction survey, incl. layout <br />G1020 Site Demoliiion and Relocations <br />Demo - building <br />Demo - canopy, drive-through <br />Demo - concrete, incl. subgrade materials <br />Demo - asphalt, incl. subgrade materials <br />Demo - sawcut <br />Demo - curb <br />Demo - planters <br />B2O SF <br />1,305 SF <br />6,280 SF <br />11,140 SF <br />712 LF <br />1,1 15 LF <br />3,890 SF <br />18.50 <br />12.50 <br />2.25 <br />2.50 <br />7.5A <br />9.00 <br />0.75 <br />15,170 <br />16,31 3 <br />14,130 <br />27,850 <br />5,340 <br />10,035 <br />2,918 <br />4 <br />22,8 <br />1 <br />75 <br />6 <br />6 <br />1 <br />6 <br />11 <br />EA <br />LF <br />MO <br />MO <br />EA <br />MO <br />SF <br />LS <br />LS <br />2,500.00 <br />13.00 <br />'1,500.00 <br />900.00 <br />5,500.00 <br />1,200.00 <br />0.17 <br />9,500.00 <br />25,000.00 <br />2,500 <br />6,'t 75 <br />9,000 <br />5,400 <br />5,500 <br />7,200 <br />3,878 <br />,V/U <br />9,500 <br />25,000