Laserfiche WebLink
DCW Cost Management <br />City of Ellensburg <br />Unity Park <br />50% Construction Docunrents Cost Plan May 2,2O23 1 5 <br />Allerrialel <br />iltr.lrlhl,. Urlll TotalRate <br />Alternate '1: Curved wall at stage (Brick in lieu of concrete) <br />DEDUCT <br />Concrete wall - cnrvec! <br />ADD <br />Brick wall - curved, 10' ht. <br />Concrete'wall - curved, 18" hi <br />Altemate Cost Before Markups <br />Contingency <br />General Conditions <br />General Requirements <br />Ofiice Overhead & Profit <br />D^^l^ ^^! l^^,.--^^^uur luJ dt lu il tour ar tug <br />Permii <br />Escalation to Start Date (Q3 2023) <br />B6-? SF <br />750 SF <br />4 4a Cr <br />55.00 <br />67.50 <br />41,250 <br />7,594 <br />ia7 6n\ lqR 7iq\ <br />7 -5Ao/o <br />6.50% <br />6.50% <br />5.50% <br />r -i)(r70 <br />1.38To <br />t ro,vovj <br />(i .l/.ii <br />rl linl <br />..', .')i-i.),i <br />i 1 '.1"1) <br />t.)r , I <br />by Owner <br />{22,460)