Laserfiche WebLink
DCW Cost Management <br />City of Ellensburg <br />Unity Park <br />50% Construction Documents Cost Plan May 2,2023 14 <br />New Construction <br />Quantrry Unll Rate Total <br />Connection to existing <br />Area drain <br />Catch basin <br />Cleanout <br />Storm drain, 6" <br />Trench drain <br />trt\ <br />EA <br />EA <br />trA <br />LF <br />LF <br />1 <br />4 <br />2 <br />2 <br />336 <br />3,500.00 <br />3,500.00 <br />3,000,00 <br />850.00 <br />65.00 <br />75.00 <br />3,500 <br />14,000 <br />6,000 <br />1,700 <br />21,840 <br />'10,050134 <br />G40 Site Electricat Utilities 22,811 SF 8.06 183,800 <br />G4010 Electrical Distriburion <br />Power distribution <br />Convenience polver - receptacles, Wp <br />G4020 Site Lighting <br />Event pole light - P1, incl. footing - 16, ht. <br />Event pole light - P2, incl footing - 18, ht. <br />Spot light - XLlA and XLl B <br />Bollard light - XlS <br />G4090 Other Site Electrical Urilities <br />Event power, allow <br />1.5" conduit <br />EV charging station - infrastructure <br />Conduit <br />2 <br />? <br />10 <br />5 <br />610 LF <br />13 EA <br />145.00 <br />650.00 <br />6,000.00 <br />6,500.00 <br />485.00 <br />1,500.00 <br />15,000.00 <br />125.00 <br />2,800.00 <br />145.00 <br />88 450 <br />8,450 <br />EA <br />EA <br />EA <br />EA <br />'12 000 <br />19 500 <br />4,850 <br />7,500 <br />1 <br />110 <br />2 <br />60 <br />LS <br />LF <br />EA <br />LF <br />15000 <br />13,750 <br />5,600 <br />8,700