Laserfiche WebLink
DCW Cost Management <br />City of Ellensburg <br />Unity Park <br />50% Construrction Documents Cost Plan May 2,2023 4 <br />22,811 117.06 2,670,296TNew Construction <br />TOTAL RECOMMENOED BUDGET 2,67A,296 <br />ALTFRNAT€STAlter"nate 1: Curved wall at stage (Brick in lieu of concrete) <br />I Aliernate 2: Builcling Opiion 1A - Unconditioned concierge area <br />f Alternate 3: Building option 1B - Unconditioned concierge area, recruced walr <br />I Alternate 4: Buitding option 2 - Reduce size <br />f Alternate Sl Builcling Option 3 - portland Loo <br />i22.460j <br />{46,432i <br />(ei t.i8) <br />i224,986t <br />{-r3:1.1]85;