My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA Assoc Sheriff and Police Chiefs Covid 19 Contract
>
Meetings
>
2023
>
08. August
>
2023-08-15 10:00 AM - Commissioners' Agenda
>
WA Assoc Sheriff and Police Chiefs Covid 19 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 7:40:02 AM
Creation date
9/12/2023 7:39:55 AM
Metadata
Fields
Template:
Meeting
Date
8/15/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Acknowledge a Modification to the Contract between the Washington Association of Sheriffs & Police Chiefs and the Kittitas County Jail
Order
12
Placement
Consent Agenda
Row ID
107456
Type
Grant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8' ALLOWABLE COSTS. Allowable costs shall include costs incurred by CONIRAC- <br />TOR from the first &te of the CONTRACT period untilthe CONTRACT is ierminated or <br />expires as provided herein, but in no event shall allowable costs exceed the maximum stated <br />amount of the CONTRACT as proviCed on LirB I of the CONTRACT Face Sheet. Costs <br />albwable underthis coNTRAcr are based on a budget approvedbywASpc. <br />WASPC shall pay to CONTMCTOR all allowabte costs incurred fom the first date of the <br />CONTRACT period until this CONTRACT is terminated or expires evkJenced by proper <br />expenditure reconciliation report, submitted to WASPC on a timely basis, insofar is th6se <br />allowable costs do not exceed the amounl appropriated or othenrrise available for such <br />purposes as stated on the CONTRACT Face Sheet. <br />9. NON€UPFI-ANTING. This award is retroactive for unanticipated costs, associatgd <br />with the Detection and Mitigation of COVID-19 in jails, from November 1 , ZAZ1, through <br />December 31,2022. Supplanting restrictions do noi apply to these costs unless other tocal <br />or state funds have been dedicated to this work. Otherwise, the CONTRACTOR shall not <br />t1s9 9!te funds specified by this CONTRACT to supplant local, federal, or other state funds. <br />CONTRACTOR shall not use state funds specified by this Contract to replace funding which <br />would otherwise be made available to CONTRACTOR had the state funds providedby this <br />CONTRACT not been provided. <br />10. CONTRACT ADi,llNlSTRATlON. WASPC's Program Coordinator is responsibte for <br />monitoring the performance of this CONTRACT, including approval and acceptance of <br />leports provided by CONTRACTOR. WASPC's Program Coordinator may provide and <br />facilitate assistance and guidance to coNTRAcroR Js necessary. <br />11- PROGRAM ADMINISTRATION. CONTRACTOR shall advise WASPC of the tocat <br />program administrator responsible for the performance of this CONTRACT, including name, <br />address, email, telephone number(s), and any subsequent changes thereto. <br />12- DATA COLLECTION. The CONTRACTOR shall utilize the data collection tootprovided by WASPC, hereinafter referred to as the WASPC Data Collection Tool, which is <br />an Excel Spreadsheet." CONTRACTOR shalldedicate sufficient resources to establish the <br />administrative processes necessary for the Data Collection Tool to be fully operational at the <br />time treatment begins at the any of the jails. <br />13. REPORTING REQUIREMENTS. CONTRACTOR shalltimely submit required reports <br />using the forms according to procedures issued by WASpC <br />14. REPORT DUE DATES <br />a. Monthly.P_rogless Report. Due on the 10th of the month following theprevious month in which funded activities were performed. <br />b. Semi'Annual Progress Report. Due on the 10th of the month foltowing thesix-month period in which fundedactivities were performed. <br />c. Flnal Assessment Report. Due on the 10th of the month following lhe twelve-month period in which funded activities were performed. <br />D&M COVID L9 Jails Contract -2OZZ-Oel Page 3 of 7
The URL can be used to link to this page
Your browser does not support the video tag.