Laserfiche WebLink
7/11/2023 2:22:44 PM Page 1 <br />BLOOM PAVILION MDP BREAKER <br />Totals (Summary) - Bid Summary: Default <br />Material <br />Non -Quoted <br />Quotes <br />Sales Tax (0.50%) <br />Total Material <br />Labor <br />Direct (1.32 hours @ $100.00) <br />Non -Productive Labor <br />Total Labor (1.32 hours) <br />Direct Job Expenses <br />Tools and Miscellaneous Materials <br />Subcontracts <br />Job Subtotal (Prime Cost) <br />Overhead (10.00%) <br />Profit (5.00%) <br />Job Total <br />Actual Bid Price <br />Material to Direct Labor ratio: 0.95 <br />Prime Cost per square foot <br />Job Total per square foot <br />Actual Bid Price per square ft <br />Labor cost per square foot <br />Labor hours per square foot <br />Gross Profit % <br />Gross Profit $ <br />Net Profit % <br />$2,585.00 <br />0.00 <br />12.93 <br />$2,597.93 <br />$132.00 <br />0.00 <br />$132.00 <br />$0.00 <br />0.00 <br />0.00 <br />$2,729.93 <br />272.99 <br />150.15 <br />$3,153.07 <br />$3.153.07 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />0.00 <br />13A2 <br />$423.14 <br />4.76 <br />