My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COP 4
>
Meetings
>
2023
>
09. September
>
2023-09-05 10:00 AM - Commissioners' Agenda
>
COP 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 1:11:16 PM
Creation date
8/31/2023 1:09:23 PM
Metadata
Fields
Template:
Meeting
Date
9/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order 4 with Concord Construction Inc. for Bloom Pavilion Addition
Order
11
Placement
Consent Agenda
Row ID
108557
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.I <br />PHONE: 509-728-0417 <br />I+Ax:509-494-$432 <br />July 11, 2023 <br />ELECTRICAL CHANGE ORDER <br />TO: CONCORD CONSTRUCTION <br />WAPATO, WA <br />JOB: BLOOM PAVILION <br />ELLENSBURG, WA <br />ECOP 3 <br />SUBJECT: MDP BREAKER ADDITION <br />CB Electric is providing a change order proposal to provide and install 1 new 3P-200Amp <br />breaker and associated hardware in the existing MDP panel to feed our new panel. The existing <br />breaker that was supposed to be used was a 2P breaker and not the needed 3P. <br />Material $ 2,598.00 <br />Labor $ 132.00 <br />P&OH: $ 423.00 <br />Total ADD: $ 3,153.00 <br />Exclusions: Sales tax, performance bond, excavation, bedding, backfill concrete & asphalt <br />cutting & patching. <br />WWW.CBELECTRICYAKIMA.COM PO BOX 8056 YAKIMA, WA 98908 LIC # CBELEEL861PS <br />
The URL can be used to link to this page
Your browser does not support the video tag.