My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COP 4
>
Meetings
>
2023
>
09. September
>
2023-09-05 10:00 AM - Commissioners' Agenda
>
COP 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 1:11:16 PM
Creation date
8/31/2023 1:09:23 PM
Metadata
Fields
Template:
Meeting
Date
9/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order 4 with Concord Construction Inc. for Bloom Pavilion Addition
Order
11
Placement
Consent Agenda
Row ID
108557
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE DETAIL SHEET <br />COP No. <br />13 <br />Remove and Dispose Unknown E)d <br />PROJECT: Job No. 2203 - IGttitas County Blaom Pavilion Addition <br />Concrete Footing Between Bloom Addition <br />CONTRACTOR: Concord Construction, <br />Inc. <br />and Swine Bam that Conflicted whew 8" Sewer <br />Line <br />UNIT <br />COSTS <br />ITEM <br />DESCRIPTION <br />QTY <br />UNIT <br />EQUIP <br />MTL <br />Labor <br />EQUIP <br />MATERIAL <br />LABOR <br />TOTAL <br />0,00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Paid Medical <br />Leave <br />@ 2.5% <br />012025 <br />0.00 <br />Subtotal <br />Small Tools @ 5 % of Labor <br />Subtotal <br />Health &Safety 2 % of Labor <br />Subtotal <br />Contractors Mark Up @ 15% <br />Subtotal <br />Subcontractors: <br />UNIT <br />COSTS <br />ITEM <br />DESCRIPTION <br />QTY <br />UNITI <br />SUB <br />MTL <br />Labor <br />SUB <br />MTL <br />Labor <br />TOTAL <br />1 <br />Kemoved and sposeci o yer s o concre e <br />that was in the way of the 8" sewer line <br />between Bloom Pavilion Addition and Swine <br />Bam, Hyatt Excavating <br />1 <br />s/c <br />1377 <br />0 <br />0 <br />1 1377.00 <br />0.00 <br />0.00 <br />1,377.00 <br />1377.001 <br />0.00 <br />0.00 <br />1377.00 <br />Contractors <br />OH & <br />P 6% on <br />Subcontractor <br />82.62 <br />Subtotal <br />1,459.62 <br />General Contractor <br />Subtotal: <br />Subcontractor Subtotal: <br />1,459 62 <br />Subtotal: <br />1,459.62 <br />Liabili Insurance <br />1.7% <br />24.81 <br />Bonds 1.17% <br />17.08 <br />B & O Taxes @ 0.5% <br />7.30 <br />u tota <br />1, 8. 1 <br />TOTAL ADD: <br />1,f,06.81 <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.