Laserfiche WebLink
COST ESTIMATE DETAIL SHEET <br />COP No. <br />13 <br />Remove and Dispose Unknown E)d <br />PROJECT: Job No. 2203 - IGttitas County Blaom Pavilion Addition <br />Concrete Footing Between Bloom Addition <br />CONTRACTOR: Concord Construction, <br />Inc. <br />and Swine Bam that Conflicted whew 8" Sewer <br />Line <br />UNIT <br />COSTS <br />ITEM <br />DESCRIPTION <br />QTY <br />UNIT <br />EQUIP <br />MTL <br />Labor <br />EQUIP <br />MATERIAL <br />LABOR <br />TOTAL <br />0,00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Paid Medical <br />Leave <br />@ 2.5% <br />012025 <br />0.00 <br />Subtotal <br />Small Tools @ 5 % of Labor <br />Subtotal <br />Health &Safety 2 % of Labor <br />Subtotal <br />Contractors Mark Up @ 15% <br />Subtotal <br />Subcontractors: <br />UNIT <br />COSTS <br />ITEM <br />DESCRIPTION <br />QTY <br />UNITI <br />SUB <br />MTL <br />Labor <br />SUB <br />MTL <br />Labor <br />TOTAL <br />1 <br />Kemoved and sposeci o yer s o concre e <br />that was in the way of the 8" sewer line <br />between Bloom Pavilion Addition and Swine <br />Bam, Hyatt Excavating <br />1 <br />s/c <br />1377 <br />0 <br />0 <br />1 1377.00 <br />0.00 <br />0.00 <br />1,377.00 <br />1377.001 <br />0.00 <br />0.00 <br />1377.00 <br />Contractors <br />OH & <br />P 6% on <br />Subcontractor <br />82.62 <br />Subtotal <br />1,459.62 <br />General Contractor <br />Subtotal: <br />Subcontractor Subtotal: <br />1,459 62 <br />Subtotal: <br />1,459.62 <br />Liabili Insurance <br />1.7% <br />24.81 <br />Bonds 1.17% <br />17.08 <br />B & O Taxes @ 0.5% <br />7.30 <br />u tota <br />1, 8. 1 <br />TOTAL ADD: <br />1,f,06.81 <br />Page 1 <br />