Laserfiche WebLink
COST ESTIMATE DETAIL SHEET <br />COP No. <br />12 <br />RFI 42 - Svnne Barn Siding <br />PROJECT: Kittitas County Bloom Pavilion Addition <br />CONTRACTOR: Concord Construction, Inc. <br />UNIT <br />COSTS <br />ITEM <br />DESCRIPTION <br />QTY <br />UNIT <br />EQUIP <br />MTL <br />Labor <br />EQUIP <br />MATERIAL <br />LABOR <br />TOTAL <br />1 <br />Demo & dispose of existing siding <br />80 <br />If <br />0.00 <br />0.38 <br />2.21 <br />0.00 <br />30.40 <br />176.80 <br />207.20 <br />2 <br />Install treated 2x12 edge form/base <br />80 <br />If <br />0.00 <br />4.09 <br />3.32 <br />0.00 <br />327.20 <br />265.60 <br />592.80 <br />0.00 <br />0.00 <br />0.00 <br />0.001 <br />357.60 <br />442.40 <br />800.00 <br />Paid Medical <br />Leave <br />2.5% <br />012025 <br />11.06 <br />11.06 <br />Subtotal <br />811.06 <br />Small Tools 5% of Labor <br />22.12 <br />Subtotal <br />833.18 <br />Health & Safe 2% of Labor <br />8.85 <br />SubtotalM842.031Contractors <br />Mark Up @ 15% <br />SubtotalSubcontnetors:UNIT <br />COSTS <br />ITEM <br />DESCRIPTION <br />QTY <br />UNIT <br />SUB <br />MTL <br />Labor <br />SUB <br />MTL <br />Labor00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Contractors <br />OH & <br />P @ 6% on <br />Subcontractor <br />Subtotal <br />General <br />Contractor <br />Subtotal: <br />968.33 <br />Subcontractor Subtotal: <br />Subtotal: <br />968.33 <br />Liability Insurance <br />1.7% <br />16.46 <br />Bonds 1.17% <br />11.33 <br />B & O Taxes @ 0.5 % <br />4.84 <br />ubtotal <br />1, 00. <br />TOTAL ADD: <br />1,000.99 <br />Page 1 <br />