My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-24-minutes-public-works-study-session
>
Meetings
>
2023
>
08. August
>
2023-08-01 10:00 AM - Commissioners' Agenda
>
2023-07-24-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 12:32:42 PM
Creation date
7/27/2023 12:29:36 PM
Metadata
Fields
Template:
Meeting
Date
8/1/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
106478
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />Project Title <br />Date <br />Kittitas County Public Works <br />Cooke Canyon Road Bridge #80181 Replay <br />07-18-2023 <br />Right of Way <br />✓❑ No Right of Way Needed <br />❑ Right of Way Needed <br />* All construction required by the <br />❑ No Relocation ❑ Relocation Required <br />contract can be accomplished <br />within the existing right of way. <br />Utilities <br />Railroad <br />❑ No utility work required <br />❑✓ No railroad work required <br />❑✓ All utility work will be completed prior to the start <br />❑ All railroad work will be completed prior to the start of <br />of the construction contract <br />the construction contract <br />❑ All utility work will be completed in coordination <br />❑All the railroad work will be completed in coordination <br />with the construction contract <br />I with the construction contract <br />Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project <br />Utilities will be required to temporarily relocate prior to the project and then install permanent after the <br />construction project. <br />FAA Involvement <br />Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes Z No <br />Remarks <br />This project has been reviewed by the legislative body of the administration agency or agencies, or it's <br />designee, and is not inconsistent with the agency's cogprehensive plan for community development. <br />Agency <br />Date By <br />DOT Form 140-101 Page 3 <br />Revised 01/2022 Previous Editions Obsolete <br />
The URL can be used to link to this page
Your browser does not support the video tag.