My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-24-minutes-public-works-study-session
>
Meetings
>
2023
>
08. August
>
2023-08-01 10:00 AM - Commissioners' Agenda
>
2023-07-24-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 12:32:42 PM
Creation date
7/27/2023 12:29:36 PM
Metadata
Fields
Template:
Meeting
Date
8/1/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
106478
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />Project Title <br />Date <br />Kittitas County Public Works <br />Cooke Canyon Road Bridge #80181 Replafl <br />07-18-2023 <br />Type of Proposed Work <br />Project Type (Check all that Apply) <br />Roadway Width <br />Number of Lanes <br />❑ New Construction ❑ Path / Trail <br />❑ 3-R <br />32 <br />2 <br />❑ Reconstruction ❑ Pedestrian / Facilities <br />❑ 2-R <br />❑ Railroad ❑ Parking <br />❑ Other <br />Bridge <br />Geometric Design Data <br />Description <br />Through Route <br />Crossroad <br />❑ Principal Arterial <br />❑ Principal Arterial <br />Federal <br />El urban <br />❑ Minor Arterial <br />❑ Urban <br />ElMinor Arterial <br />Functional <br />0 Rural <br />❑ Collector <br />❑ Rural <br />❑ Collector <br />Classification <br />❑ NHS <br />❑ Major Collector <br />❑ NHS <br />❑ Major Collector <br />❑ Minor Collector <br />❑ Minor Collector <br />7] Local Access <br />❑ Local Access <br />Terrain <br />0 Flat ❑ Roll ❑ Mountain <br />❑ Flat ❑ Roll ❑ Mountain <br />Posted Speed <br />50 <br />Design Speed <br />50 <br />Existing ADT <br />268 <br />Design Year ADT <br />268 <br />Design Year <br />2022 <br />Design Hourly Volume (DHV) <br />Performance of Work <br />Preliminary Engineering Will Be Performed By <br />Others <br />Agency <br />shared agency and consultant <br />80 % <br />20 <br />Construction Will Be Performed By <br />Contract <br />Agency <br />contract <br />100 % <br />Environmental Classification <br />❑ Class I - Environmental Impact Statement (EIS) <br />0 Class II - Categorically Excluded <br />(CE) <br />❑ Project Involves NEPA/SEPA Section 404 <br />❑ Projects Requiring Documentation <br />Interagency Agreement <br />(Documented CE) <br />❑ Class III - Environmental Assessment (EA) <br />❑ Project Involves NEPA/SEPA Section 404 <br />Interagency Agreements <br />Environmental Considerations <br />work over irrigation canal will be performed while <br />canal system is not in service between <br />November and <br />April <br />uvi rurm iqv- ivi Paget <br />Revised 01/2022 Previous Editions Obsolete <br />
The URL can be used to link to this page
Your browser does not support the video tag.