Laserfiche WebLink
MP TO 70b Number: TBD PROJECT LENGTH 0.00 <br />CONSTRUCTION DURATION: 2 weeks <br />OPING ESTIMATE $374,035 CREATED: 5/16/2023 By: CC <br />s County is considering Installing a bathroom at the Thorp MITI museum after taking over me sae. installing a plumbed bathroom will need running water and a dralnfieu for the waste water along with all the <br />ed appurtenances. <br />PREPARATION <br />1 <br />LS <br />0001 <br />MOBILIZATION <br />10% <br />$22,400 <br />SANITARY SEWER <br />1 <br />LS <br />NSI <br />PROPRIATARY GRIDER PUMP <br />$15,000.00 <br />$151000 <br />1 <br />LS <br />NSI <br />CONCRETE VAULT <br />$15,000.00 <br />$15,000 <br />1,275 <br />LF <br />NSI <br />2IN PRESURIZED PIPE NETWORK <br />540D) <br />$51.000 <br />1 <br />LS <br />NSI <br />INSTALL DRAIN FIELD (50 SF) <br />00 <br />$t2,00D.00 <br />$12,000 <br />WATER LINES <br />1 <br />LS <br />NSI <br />DRILL WELL <br />$00 <br />E3,000 <br />1 <br />LS <br />NSI <br />PROPRIATARY WATER PUMP <br />85,00000.00 <br />00 <br />1,150 <br />LF <br />NSI <br />21N SERVICE CONNECTION <br />$4 <br />$40.00 <br />$46,4fi,000 <br />UTILITY SERVILE <br />1 <br />LS <br />NSI <br />EXTEND POWER TO WELL <br />$20,000.00 <br />$20,000 <br />STRUCTURE <br />1 <br />LS <br />NSI <br />INSTALL BATHROOM FACILITY (500 SF) <br />$30.000.00 <br />$30.000 <br />PROJECT CHANGE TRACKING <br />Data BY Lommenb <br />810 ITEM SUBTOTAL WIC MOBILIZATION $224,000 <br />MOBILIZATION 10.0 $22,400.On <br />BID ITEM SUBTOTAL $246A00 <br />DESIGN ALLOCATIONS 0,00% $o <br />BID ITEM TOTAL $246.400 <br />SALES TAX @ 0.00% $0 <br />PROJECTSUBTOTAL $24fi,400 <br />CONSTRUCTION ENGINEERING018% $44,352 <br />CONTINGENCIES @ 20% $49,280 <br />CN ESTIMATE $340,032 <br />PE PHASE 10% 30,003 <br />RNl ACQUISITION COSTS $0 <br />PROJECT TOTAL $374,035 <br />