Laserfiche WebLink
Job No. 2703 - Bloom Pavilion Addition <br />COP 06 - Haul Unsuitable Soils Off-Site <br />Hyatt GravelTicket TN to CY Calculation Summary <br />Total <br />4120/2023 <br />Gravel Hauled to Date <br />Date Tons Conv. Factor Cubic Yards <br />3/2A12A23 279.O2 t.4 199.30 <br />3l2Ll2A23 386.09 L.4 275.78 <br />312212023 509.09 r.4 363,64 <br />3123/2023 34r.94 L.4 244.24 <br />4/L3/2023 223.79 L.4 159.85 <br />4l14/2023 57.09 t.4 40.78 <br />1283.59 <br />rlE