Laserfiche WebLink
CoF ob <br />4/20/2023Job No. 2203 - Bloom Pavilion Addition <br />COP 06 - Haul Unsuitable Soils Off-Site <br />Hyatt Gravel Ticket TN to CY Calculation 5ummary <br />Total <br />Y'+ rll <br />Gravel Hauled to Date <br />Date Tons Conv. Factor Cubic Yards <br />3/2o12A23 279.O2 1.4 199.30 <br />3lzLl2A23 386.09 7.4 275.78 <br />3122/2023 509.09 1.4 353.54 <br />3/2312023 341.94 t.4 244.24 <br />4lL3l2o23 223.79 1.4 159.85 <br />4lL4/2A23 57.09 1.4 44.78 <br />1283.59