My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-24-minutes-public-works-study-session
>
Meetings
>
2023
>
05. May
>
2023-05-02 10:00 AM - Commissioners' Agenda
>
2023-04-24-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 1:06:59 PM
Creation date
4/27/2023 1:06:04 PM
Metadata
Fields
Template:
Meeting
Date
5/2/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
102562
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roslyn <br />Cemetery Irrigation System <br />Pre -Construction and Construction <br />Engineer's Estimate <br />ITEM <br />UNIT <br />UNIT PRICE <br />QUANTITY <br />COST <br />Planning <br />LS <br />$3,045 <br />1 <br />$3,045 <br />Design -Contractor Procurement <br />LS <br />$4,200 <br />1 <br />$4,200 <br />Mobilization and Demobilization <br />LS <br />$5,000 <br />1 <br />$5,000 <br />Temporary Traffic Control <br />LS <br />$500 <br />1 <br />$500 <br />Trench Excavation Safety <br />LS <br />$500 <br />1 <br />$500 <br />Erosion Control Measures <br />LS <br />$1,500 <br />1 <br />$1,500 <br />6 -inch PVC w/bedding material <br />LF <br />$45 <br />2265 <br />$101,925 <br />2 -inch PVC w/bedding material <br />LF <br />$25 <br />1645 <br />$41,125 <br />Trench Backfill <br />CY <br />$60 <br />75 <br />$4,500 <br />Main Fittings <br />LS <br />$2,500 <br />1 <br />$2,500 <br />6 -inch Gate Valves <br />EA <br />$1,300 <br />6 <br />$7,800 <br />Double Check Valves <br />EA <br />$8,000 <br />2 <br />$16,000 <br />Hydrant Assembly <br />EA <br />$4,500 <br />2 <br />$9,000 <br />Connection to Existing Water Main <br />EA <br />$2,000 <br />2 <br />$4,000 <br />Site Restoration <br />LS <br />$1,500 <br />1 <br />$1,500 <br />HMA Repair <br />SF <br />$5 <br />750 <br />$3,750 <br />Estimate Subtotal: $206,845 <br />15% Contigency: $31,027 <br />Estimated Sales Tax at 8%: $19,030 <br />Total Estimate: $256,901 <br />-Assume existing native soils are largely acceptable for trench backfill. <br />-Actual Construction Costs may vary based on the Contractor, Supplier, and unexpected site <br />conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.