My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2023
>
05. May
>
2023-05-02 10:00 AM - Commissioners' Agenda
>
2023-04-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 1:06:51 PM
Creation date
4/27/2023 1:06:03 PM
Metadata
Fields
Template:
Meeting
Date
5/2/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
102562
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
View images
View plain text
t <br />COMMUNITY DEVELOPMENT DEPARTMENT <br />501 N. Anderson St., Ellensburg WA 98926 <br />Land Use Permitting (509) 962-7231 Construction Permitting (509) 962-7239 <br />Jamey Ayling, Director <br />Phone: (509) 962-7232 Fax: (509) 925-8655 E -Mail: aylingj@ci.ellensburg.wa.us <br />DATE: February 16, 2023 <br />FROM: Laura Wilson, Planner <br />FILE #: P23-006 <br />RE: Kittitas County 6th St. Parking Lot Pre -Application <br />LOCATION: 205 W 6th Ave, Ellensburg <br />Applicable Land Development Code requirements outlined in ECC 15.550.080 Parking Lot Design <br />and Construction Standards for the above -referenced project include the following: <br />1. The property is zoned Central Commercial. It fronts three streets: N Water St., W 7th Ave, <br />and W 6th Ave. <br />2. There are no critical areas on the properties, so a critical area application is not required. <br />3. Because the project is proposing over 20 parking spaces, a SEPA is required. A site <br />development permit will be required. The property will also require a boundary line <br />adjustment to combine the parcels. <br />4. ECC 15.550.080 provides guidance on Parking lot design and construction standards. <br />Some of those standards are expanded in further detail in the following comments. Some of <br />those code refences are: <br />• For Parking lot location standards along street frontages, see ECC 15.510, Site <br />Orientation <br />• For pedestrian access provisions within parking lots, see ECC 15.520.040, Internal <br />pedestrian access and design. <br />• For lighting standards, see Chapter 15.580 ECC, Outdoor lighting. <br />• For parking lot screening and internal landscaping, see ECC 15.570.050(A), Surface <br />Parking Lot Landscaping. <br />5. ECC 15.510 Site Orientation. <br />The parking lot would need to comply with the Site Orientation standards found in ECC <br />15.510. N Water St and W 7th Ave are secondary streets and W 6th is a storefront street. <br />The following standards are applicable to N. Water Street and W 7th Ave which are <br />secondary streets: <br />*No more than 50% of the street frontage can be occupied by off-street parking and <br />driveways. *Departures will be considered pursuant to ECC 15.210.060 and ECC <br />15.510.120. There is no parking adjacent to the street frontage along 7th Ave, but there is <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).