My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2023
>
05. May
>
2023-05-02 10:00 AM - Commissioners' Agenda
>
2023-04-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 1:06:51 PM
Creation date
4/27/2023 1:06:03 PM
Metadata
Fields
Template:
Meeting
Date
5/2/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
102562
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 k . <br />S7iIi�G70:N <br />Date: February 24th, 2023 <br />CITY OF ELLENSBUR.G <br />501 North Anderson Street; Ellensburg, WA 98926 <br />Ph: (509) 962-7124 Fax: (509) 925-8662 <br />www.ci.ellensburg.wa.us <br />Memorandum <br />To: Laura Wilson, Office of Community Development <br />From: Tyler Goeden, Project Engineer <br />Re: P23-006 Kittitas County Corrections Parking Lot, 205 W. 6th Ave Pre -Application <br />The following are the City of Ellensburg Electric Utility comments for the P23-006 Kittitas <br />County Corrections Parking Lot, 205 W. 6th Ave Pre -Application meeting. <br />Electric: <br />The City of Ellensburg Electric Utility (City Light) has an existing high voltage (12.47kV) <br />overhead power pole line that runs north -south on the east side of the alley adjacent to the <br />applicants property. This pole line will serve as the source of power for the applicants proposed <br />parking lot. The local telephone company, Consolidated/Fairpoint, has multiple telephone poles <br />running along the south side of 7th Ave adjacent to the applicants property. If any modifications <br />needs to be done to the telephone lines or poles, the applicant is responsible for contacting the <br />telephone company. <br />The provided preliminary site plan shows a line running from an existing City Light power pole <br />on the east side of the alley to a new padmount transformer on the applicants property, and <br />another line from the new padmount transformer to a new customer owned junction box. The <br />applicant will be required to fill out a Right -of -Way permit with the City of Ellensburg Public <br />Works Department, to allow them to excavate in the alley. The proposed location for the <br />padmount transformer will be need to be relocated to protect it from vehicular traffic, preferably <br />a little to the north and west in the larger open area to the east of the northern parking lot <br />entrance/exit. Also, the line running from the transformer to the customer owned junction box <br />needs to be modified, with the line running from the transformer to a customer owned, installed, <br />and maintained meter base (Meter provided by City Light), and then from the meter base to the <br />customer owned junction box. <br />The plans also show 4 pinto type lights and some trees in the island in the center of the lot. Pinto <br />lights are relatively short, and planting trees near them will block much of the light emanating <br />from the Pinto's, so applicant is advised to remove any trees in the island around the Pinto lights. <br />YAEnergy Services\Light\Developer Information Packet\SEPA & Plat App Responses\Pre-Application <br />Meetings\2023\P23-006 Kittitas Co. Corrections Parking Lot\ P23-006 Kittitas County Corrections Parking Lot - <br />Comments.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.