My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Works Board Loan Contract Number PC23-96103-132
>
Meetings
>
2023
>
04. April
>
2023-04-04 10:00 AM - Commissioners' Agenda
>
Public Works Board Loan Contract Number PC23-96103-132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 12:14:52 PM
Creation date
4/17/2023 12:14:32 PM
Metadata
Fields
Template:
Meeting
Date
4/4/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Public Works Board Construction Loan Contract.Number PC23-96103-1323
Order
8
Placement
Consent Agenda
Row ID
101486
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope I D: 22 1 BBTAE-8D32-45F 2-81 A8-FA7F96A7 1 7 1 0 <br />Should the Contractor submit the Certified Project Completion Report within forty-eight (a8) months of the <br />date of Contract execution, the Contractor may choose one of the two following incentives upon project <br />completion: <br />Option A: The repayment period will be increased by twenty-four (24) months, not to exceed the life <br />of the asset, OR: <br />Option B: The interest rate will be decreased by one-quarter of one percent (0.250 ). <br />Should the Contractor submit the Certified Project Completion Report within thirty-six (36) months of the <br />date of Contract execution, the Contractor may choose one of the following two incentives upon project <br />completion: <br />Option C: The repayment period will be increased by sixty (60) months, not to exceed the life of the <br />asset, OR; <br />Option D: The interest rate will be decreased by up to one-half of one percent (0.50%). <br />Once an option is selected, the Contract shall be modified to note the appropriate change and no further <br />adjustment to the Contract for Performance lncentives shall be authorized. lrrespective of the performance <br />incentive chosen, at no point in time shall the minimum loan interest rate be less than 0.25o/o. <br />The calculation of interest rate and term adjustments will apply to the remaining payments beginning from <br />the date the Project Completion report is certified. <br />1.13 Proiect Gompletion Amendment and Certified Proiect Completion Report <br />The Contractor shall complete a Certified Project Completion Report when all activities identified in the <br />SCOPE OF woRK are complete. The BOARD will supply the Contractor with the Certified Project <br />Completion Report form, which shall include: <br />A. A certified statement that the project, as described in the declared SCOPE OF WORK, is complete and, <br />if applicable, meets required standards. <br />B. A certified statement of the actual dollar amounts spent, from all funding sources, in completing the <br />project as described in the SCOPE OF \VORK. <br />C. Certification that all costs associated with the project have been incurred and have been accounted for. <br />Costs are incurred when goods and services are received and/or Contract work is performed. <br />D. A final voucher for the remaining eligible funds. <br />E. Pictures of Completed Project. <br />The Contractor will submit the Certified Project Completion Report together with the last lnvoice Voucher for <br />a sum not to exceed the balance of the loan amount. The final lnvoice Voucher payment shall not occur <br />prior to the completion of all project activities identified in the SCOPE OF VORK and the BOARD's receipt <br />and acceptance of the Certified Project Completion Report. <br />The Project Completion Amendment shall serve as an amendment to this Contract determining the final <br />loan amount, local share, term, and interest rate. <br />1.14 Proiect Siqns <br />lf the Contractor displays, during the period covered by this Contract, signs or markers identifoing those <br />agencies participating financially in the approved project, the sign or marker must identifo the Washington <br />State Public Works Board as a participant in the project. <br />4
The URL can be used to link to this page
Your browser does not support the video tag.