My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-27-minutes-ec-study-session
>
Meetings
>
2023
>
04. April
>
2023-04-04 10:00 AM - Commissioners' Agenda
>
2023-03-27-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 12:12:17 PM
Creation date
3/30/2023 12:09:26 PM
Metadata
Fields
Template:
Meeting
Date
4/4/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
101486
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />SCOPE OF WORK <br />The Contractor will supply the following: <br />Install new Noble panel system to specifications as shown'. <br />Protect:17TA5 FAIRGROUNDS <br />REF: :GINGERSOLLLINEQIU <br />MULTI USE PEN SYSTEM <br />Author: G INGERSOLLH_ <br />Date:05/23/2022 — <br />Contractor will then take measurements of "make-up" areas", report those <br />measurements to Noble Panels & Gates, pick up and deliver those panels, and finish <br />the installation of the make-up panels. <br />The Contractor shall not deviate from this scope of work without a change order <br />approved in writing by the Event Center Director. Additional services provided by the <br />Contractor including, but not limited to, costly repairs or connection services, are not <br />contemplated by this agreement and the County assumes no responsibility for such <br />work. <br />Professional Services Agreement <br />Page 13 <br />4i <br />1 <br />- sjown tvrrrr RCmovna t e sEmO.v .• <br />Protect:17TA5 FAIRGROUNDS <br />REF: :GINGERSOLLLINEQIU <br />MULTI USE PEN SYSTEM <br />Author: G INGERSOLLH_ <br />Date:05/23/2022 — <br />Contractor will then take measurements of "make-up" areas", report those <br />measurements to Noble Panels & Gates, pick up and deliver those panels, and finish <br />the installation of the make-up panels. <br />The Contractor shall not deviate from this scope of work without a change order <br />approved in writing by the Event Center Director. Additional services provided by the <br />Contractor including, but not limited to, costly repairs or connection services, are not <br />contemplated by this agreement and the County assumes no responsibility for such <br />work. <br />Professional Services Agreement <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.