Laserfiche WebLink
<]QC� <br />GJ Kittitas County Solid Waste/ Facilities On -Call <br />SCJ ALLIANCE February 17, 2023 <br />CON5VLTING SERVICES Page of <br />6) Contract Execution: SCI can assist with the coordination of the construction contract <br />documents and the Notice To Proceed notification to the Contractor. <br />Understanding/Assumptions <br />1) Permitting fees are required by agencies and will be paid by the County directly. <br />2) We do not anticipate or estimate topographic surveys, cultural resources, biological <br />assessments, or geotechnical services. If the project later identifies this need, we can add as an <br />amendment. <br />3) Construction Services for this project will be assessed at the time of bid award. The scope of <br />those services will be added via addendum once they have been quantified. <br />4) Stormwater design is not required. <br />5) This estimate assumes one public bid and award process. <br />Deliverables <br />1) Preliminary Contract Plans. <br />1) Preliminary Cost Estimate. <br />2) City/County Plan submittal package. <br />3) Contract Plans. <br />4) Special Provisions. <br />5) Project Manual (PS&E). <br />6) City Permits (2). <br />7) Bid Tabulation. <br />8) Bid Award Notification. <br />9) Addendum (if necessary). <br />10) Notice of Contract Execution. <br />CONTRACT SUMMARY <br />(not to be exceeded without prior authorization) <br />1_� i7T' <br />$9,850 <br />T&M <br />$1,465 <br />T&M <br />$3,490 <br />T&M <br />$3,755 T&M <br />$18,560 T&M <br />25 N Wenatchee Ave, Suite 238 0 Wenatchee, WA 98801 > Office 509.886.3265 o Fax 360.352.1509 0 scjalliance.com <br />