My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-27-minutes-public-works-study-session
>
Meetings
>
2023
>
03. March
>
2023-03-07 10:00 AM - Commissioners' Agenda
>
2023-02-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 12:26:34 PM
Creation date
3/2/2023 12:22:30 PM
Metadata
Fields
Template:
Meeting
Date
3/7/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
100147
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Priority 2: Bridge and Structure Improvement Project <br />Through ongoing efforts to identify hazards near and/or at bridges or structures countywide, 178 <br />structures were identified to have deficiencies. These were codified into three types. Code 3 for no rail <br />or timber rail and 60 were identified. Code 2 for no approaches or non-crashworthy railing and 100 were <br />identified. Code 1 for rail that does not meet current AASHTO Manual for Assessing Safety Hardware <br />Standards (MASH) and 18 were identified. With the high quantity of deficient safety measures on <br />structures being countywide, an approach by maintenance district grouping was implemented to allow <br />for rail improvements in a series of projects. As further data such as survey was collected to provide <br />preliminary engineering options to implement these improvements to reduce the severity of crashes <br />that have or may occur at these structures, another element was identified. By adding rail to these <br />deficient structures, the county found that improvement would not be an improvement at all. Attaching <br />to a deficient structure would not meet current standards. it would change the Code 3 to a Code 1 but <br />would not reduce the hazard. No protection for errant vehicles leaving the roadway would still be <br />present. The narrow structures, narrow roads, and no shoulder would create a larger project at each <br />site. Another approach is needed. A planning project that would allow for the research needed to create <br />a solution that would meet the Target Zero goals, meet standards, and be the most cost-effective <br />solution for the County. <br />With further research, planning and preliminary engineering, a project that would be successful for <br />these structures will be needed. As the county forces are limited, a project that allows for consultant <br />services to create a crashworthy and cost-effective solution is a priority for Kittitas County. Structure <br />widening or replacement projects to allow for improvements to meet current standards is an approach <br />that must be considered and planned for. <br />15 <br />