Laserfiche WebLink
Priority 1: Huntzinper Rd Safety Improvements <br />N <br />Till <br />x <br />1 <br />Huntrh:ger Rd <br />s1 <br />Roads Owned By: <br />aa� <br />_K <br />• Phase 1 is between MP 5.14 to MP 10.74 where road segments have crashes involving injuries and severe <br />injuries, segments with sharp horizontal curves, vertical curves, steep embankments, very little to no <br />shoulder, and areas In need of guardrail, signs and/or delineation. <br />ESTIMATED COST $1,580,700 <br />• Phase 2 is between MP 2.70 to MP 5.14 where road segments have several horizontal curves, steep <br />embankments, and no shoulder in places with minimal countermeasures in place. <br />ESTIMATED COST $1,457,775 <br />a <br />14 <br />