My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 2023-032
>
Meetings
>
2023
>
02. February
>
2023-02-21 10:00 AM - Commissioners' Agenda
>
RES 2023-032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:24:39 AM
Creation date
3/1/2023 11:24:32 AM
Metadata
Fields
Template:
Meeting
Date
2/21/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Authorize the Kittitas County Public Works Director's Signature on Task Order No. 1 with Watershed Science and Engineering for the West Interchange Hydraulic Analysis
Order
19
Placement
Consent Agenda
Row ID
99860
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
View images
View plain text
€+WATERSHED <br />SCIENCE & ENGINEERING February 14,2023 <br />Task 3. Development lmpact Assessment <br />Based on results from Task 2, MFA will revise the proposed development plan to accommodate the <br />preferred flood reduction alternative. WSE will complete the following tasks to assess potentialflood <br />impacts of full buildout conditions under the revised plan. <br />Task 3.7. Flood Review of Proposed Development <br />WSE will: <br />o Create figures that overlay the proposed development plan on top of the flood inundation extents <br />and BFEs. This will identify the areas of planned development that will be impacted by flooding. <br />o WSE will present the figures to the County, MFA, and stakeholders in a virtual meeting. The results <br />and potential required development refinements will be discussed. <br />Deliverables: Figures overlaying proposed development concept on flood extents and BFEs, <br />Assumptions: WSEandwillparticipateinuptotwovirtualmeetingswithMFAtodiscussdevelopment <br />alternatives, MFA and the stakeholders will select a preferred development concept. MFA will refine the <br />development concept to reflect recommendations expressed during the stakeholder meeting, and will <br />develop a conceptualfull buildout plan. <br />Task 3.2, Floodplain lmpoct and Compensotory Stordge Assessment <br />WSE will update the preferred alternative hydraulic model to incorporate the proposed development full <br />buildout fill plan, run the model to simulate the t% AEP flood, and compare results to baseline conditions <br />to document changes in floodplain BFEs, inundated extents, and flood storage. The purpose will be to <br />evaluate potentialflood impacts and compensatory storage requirements of full buildout conditions. <br />Results will be provided to the County and project stakeholders to support land use planning discussions. <br />Deliverables: <br />Figures comparing BFEs and flood inundation for full buildout conditions to baseline conditions to support <br />floodplain impacts assessment and compensatory storage requirements for the proposed development <br />Assumption: <br />Fill extents for the full buildout condition would be determined by MFA and the County. The County will <br />provide a LandXML including grading/fill for each land use alternative to WSE for incorporation into the <br />hydraulic model. <br />Task 3.3, Technical Memorandum <br />WSE will prepare a letter report to document the floodplain impacts and compensatory storage <br />requirements for the full buildout condition. The memorandum will also include descriptions of additional <br />floodplain development factors that will need to be evaluated/considered if the stakeholder group decides <br />to advance the preferred alternative (e.g. a FEMA conditional letter of map revision (CLOMR), <br />compensatory storage requirements, floodplain impacts that will need to be mitigated). The memorandum <br />will be submitted to the County for review. WSE will finalize the memorandum upon receipt of comments, <br />Deliverables: <br />Draft Memorandum <br />Final Memorandum
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).