Laserfiche WebLink
Upon the expiration of this Lease and in the event of the acquisition of the <br />hnprovements by Lessor, Lessee, at Lessee's sole cost, shall (i) promptly and <br />peaceably sumender to Lessor the Premises and Improvements clean and free of <br />debris and in good order and condition; (ii) repair in a good and workrnanlike <br />manner any damage to the Premises, reasonable wear and tear excepted, or the <br />Airport by the removalof Lessee's personal property; (iii) deliver to Lessor all <br />keys and other items integral for access and operation of the Improvements; (iv) <br />perform Lessee's environmental obligations as provided in Section 7; and (v) <br />relnove all movable personal property and trade fixtures and signage that are not <br />owned by Lessor; provided that Lessee must obtain Lessor's prior written consent <br />to remove any such property if such removal may impair the structure of any <br />building. Upon any expiration or termination of this Lease, including, but not <br />limited to, termination for abandonment of the Premises, all property that Lessee <br />leaves on the Premises shall conclusively be deemed to have been abandoned and <br />may be appropriated, sold, stoLed, destroyed, or otherwise disposed of by Lessor <br />without notice. and without arry obligation to account, to Lessee or any other <br />person, provided that the disposition of Improvements shall be as provided in <br />Section 6.4. Lessee shall pay to Lessor all expenses incurred in connection with <br />the disposition of such property in excess of any amount received by Lessor fiom <br />such disposition. <br />6.5 Failure to construct Improvements: <br />LESSEE agrees that, should LESSEE fail to construct the structure(s) described in Exhibit <br />"D" as outlined in the negotiated construction schedule and in conformity with airport <br />standards (also parl of Exhibit D), this lease shall automatically terminate, and LESSEE <br />forfeits any and all interest in the premises. Proposed improvements must have a negotiated <br />construction schedule and be determined in conformity with applicable airport standards <br />prior to rnaking application for a building permit. General construction requirements are <br />attached hereto as Exhibit E and incorporated herein by this reference. Lessor approval is <br />required for all such building permit applications. <br />6.6 Duty of LESSEE to prevent or remove encumbrances to improvements: <br />LESSEE shall, as additional consideration for the grant of this LEASE, insure that all liens, <br />security interest and other encumbrances against said irnprovements and structures except <br />those created or suffered by LESSOR, whether consensual or involuntary, shall be paid, <br />discharged or satisfied prior to the time for reversion thereof to LESSOR; and, in any event, <br />the parties acknowledge that LESSOR shall not, by virtue of tennination of the leasehold <br />interest nor reversion of the structures or other improvements, be liable for any debt or <br />encumbrance associated therewith, whether now existing or hereafter incurred, levied or <br />attached. <br />7. HAZARDOUSSUBSTANCES: <br />LESSBE ?- nn I IAMLESSOR V