Laserfiche WebLink
<br /> <br />7 <br /> <br />supply for Suncadia is through an approved Group A Water System and as discussed within the “Water <br />Supply” section of the Development Agreements (Page 9). <br /> <br /> <br />Washington State Department of Archaeology and Historic Preservation <br />DAHP submitted the following comments: <br /> <br />DAHP provided comments regarding their statewide predictive model indicating high probability of <br />encountering cultural resources within the proposed project area and the scale of the proposed ground <br />disturbing actions would destroy and archaeological resources present and the recommendation of a <br />professional archaeological survey being conducted and a report be produced prior to ground disturbing <br />activities, recommendation that any structures 45 years of age or greater be evaluated for eligibility for <br />listing in the National Register of Historic Places in Historic Property Inventory <br /> <br />Staff Response: The applicant provided a response to the comments submitted by DAHP, included as <br />Index #35. The applicant stated that the Suncadia Resort property was extensively surveyed for cultural <br />and historic sites during the environmental impact process culminating in the identification of sites as <br />well as adoption of appropriate mitigation measures as set forth in Conditions of Approval C-21 – C-23 of <br />Exhibit F to the Development Agreement with Kittitas County. The applicant is required to adhere to all <br />applicable regulations as outlined in the Development Agreement. The 30 year term of the Development <br />Agreement will end on October 9, 2030 (Development Agreement Section 1.2 Term). <br /> <br />Kittitas County Public Works <br />KCPW provided the following comments: <br /> <br />KCPW provided comments in regards to the timing of improvements, required “Plat Notes”, the plat <br />needing to show the acceptance signature of the County Engineer, engineered plans needing to be <br />submitted to Public works for Civil Review and needing to be completed prior to Final Plat, the need to <br />submit an updated report detailing what monitoring has been completed in the completion of the Traffic <br />Monitoring Plan process, an inventory of equivalent residential units, or the accounting method utilized in <br />the water system plan, affirming sufficient capacity serving the plat, an inventory of equivalent residential <br />units, or the accounting method utilized in the general sewer plan, as well as survey comments and flood <br />requirements for the 100 year floodplain boundary needing to be included on the face of the plat. <br /> <br />Staff Response: The applicant provided a response to the comments submitted by Public Works, included <br />as Index #35. The applicant acknowledged all of the provided engineering and survey comments and will <br />address prior to final plat submittal. Staff has conditioned the preliminary plat to meet all of Public <br />Works comments. <br /> <br />Washington State Department of Natural Resources <br />DNR provided the following comments: <br /> <br />DNR provided comment regarding the parcels being primarily forested land and reiterated the need for a <br />Forest Practices Application if merchantable timber is removed/harvested as part of the proposal of if <br />converting to non-forestry use. <br /> <br />Staff Response: Suncadia has submitted the FPA for this division and has obtained an approved FPA <br />number from DNR. <br /> <br />Kittitas County Public Health <br />KCPH submitted the following comments: <br />