Laserfiche WebLink
<br />CRP/RC #: 309-21 <br />Location: MP 0.0-MP 1.55 <br />Ellensburg <br />Last Updated: 8/29/2022 <br />Project Number: RC2291-L1 Length: 1.55 miles <br />Basis for Project: Safety, Rehabilitation, & Improvements Construction: 2025 <br />Project Description: <br />An increase in agricultural activities in the Badger Pocket area has brought issues to the surface concerning the road net- <br />work. Outdated roadway construction, geometrics, narrow right of way widths, impacts to existing irrigation franchises, and congestion are some of the items to be broken into phases as it affects many roads in the area. Priority roads to be deter- <br />mined prior to design. <br /> <br />Status: Planned for design and Right of Way in 2024 and construction in 2025. <br />TrafÕc Impacts: TBD <br />For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us <br />Badger Pocket Area Road <br />Improvements Payne Rd– Phase 1 <br />Funding Source: <br />Local <br />funding <br /> $3,700,000 <br />Total: $3,700,000 <br />Payne Rd looking South Payne Rd and Thrall Rd intersection <br />14