Laserfiche WebLink
<br />CRP/RC #: 308-21 <br />Location: MP 0.65-MP 0.75 Snoqualmie Pass <br />Last Updated: 8/29/2022 <br /> <br />Project Number: RC2197-C1 Length: 0.10 miles <br />Basis for Project: Safety Construction: 2025 <br />Project Description: <br />The Yellowstone Road culvert project will replace the existing undersized and deteriorating culvert with a larger culvert that <br />has the capacity to handle high water Öow and sediment that has been found in the Õsh bearing stream. This will prevent the washout of the county road as well as improve Õsh passage. <br /> <br />Status: Planned for design and Right of Way in 2024 and construction in 2025. <br />TrafÕc Impacts: TBD <br />For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us <br />Funding Source: <br />Local <br />funding <br /> $1,755,000 <br />Total: $1,755,000 <br />Yellowstone Rd Culvert <br />Replacement 15