Laserfiche WebLink
project numberCRP #Res. #designright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructionProject Total2028 <br />KITTITAS COUNTY <br />2023-2028 <br />SIX YEAR TRANSPORTATION IMPROVEMENT PLAN <br />2023 2024 2025 2026 2027 <br />42512 1.11 1.21 Local <br />29 650 <br /> <br />30 700 <br /> <br />31 750 <br /> <br />32 800 <br /> <br />33 850 <br /> <br />34 900 <br /> <br />2545 350 1213 3735 500 345 651 9720 883 0 427 7602 637 345 300 5690 416 300 373 7036 0 0 630 4823 48521 <br />1,500 1,500 <br />ADDITIONAL FUNDING NEEDED 1,326 984 <br />REQUIRED FUNDING TO MAINTAIN RESERVES 1,500 1,500 1,500 1,500 <br />2,532 174 <br />TOTAL ROAD FUND BALANCE End of Year 6,532 4,767 2,532 174 3,230 516 <br />TOTAL ROAD FUND BALANCE Beginning of Year 6,817 6,532 4,767 2,532 <br />ANNUAL IMPACT TO FUND RESERVES (NO NEW REV)(285) (1,765) (2,235) (2,358) 698 342 <br />Expected Annual Expense (Road Fund)11,903 12,716 13,329 13,265 <br />Expected Annual Revenue (Road Fund)14,312 14,782 17,569 16,415 17,053 17,838 <br />13,379 13,947 <br />5,149 1,904 <br />NET OF GRANTS 2,694 3,831 6,475 5,508 2,976 3,549 <br />ANNUAL OTHER FUNDS (GRANTS,RID)(+)5,149 7,385 2,437 1,464 <br />ANNUAL CAPITAL IMPROVEMENT TOTALS (-) 7,843 11,216 8,912 6,972 8,125 5,453 <br />DESIGN/ROW/CONSTRUCTION TOTALS <br />2023 2024 2025 2026 2027 2028 750Gravel Road upgrade 28 <br />900Gravel Road upgrade 26 <br />Gravel Road upgrade 27 <br />850 800 <br />Gravel Road upgrade 25 200Gravel Road upgrade 23 <br />650Gravel Road upgrade 24 <br />7002 of 2