My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 - 2028 Six-Year Capital Improvement Plan
>
Meetings
>
2022
>
12. December
>
2022-12-20 2:00 PM - 2:00pm Public Hearing
>
2023 - 2028 Six-Year Capital Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 12:19:36 PM
Creation date
12/15/2022 12:17:12 PM
Metadata
Fields
Template:
Meeting
Date
12/20/2022
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to consider Capital Improvement Program for the Planning Period 2023-2028.
Order
2
Placement
2:00pm Public Hearing
Row ID
97391
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
project numberCRP #Res. #designright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructionProject TotalRoad# BMP EMP STIP <br />Advertise <br />CAPITAL IMPROVEMENT PROJECT NAME Grant - planned <br />1 Manastash Rd Creek Bank Stab, and Snow Park Impr.RC1573-E1 273-16 2016-099 30 100 70 1500 <br />95301 10.65 11.01 WA-12576 <br />2 RC2193-FL 306-21 2022-016 700 100 2407 <br />38350 0.07 0.07 WA-14038 <br />3 RC1594-B1 295-18 2019-163 400 <br /> FHWA project <br />4 RC2290-ST 500 250 <br /> State Project <br />5 RC2093-RP 304-20 2021-071 254 50 101 2177 67 1452 <br />31510 0 1.74 State Funding <br />6 RC2194-BR 315-22 2022-156 695 100 10 274 40 1554 <br />43883 0.24 0.24 WA-14791 <br />7 RC2195-BR 316-22 2022-155 641 100 10 254 40 1487 <br />34761 0.59 0.59 WA-14792 <br />8 RC2196-HS 313-21 2022-018 15 50 317 <br />VARIOUS WA-14039 <br />9 RC2199-HS 314-21 2022-017 15 100 486 <br />VARIOUS WA-14040 <br />10 RC2292-G1 310-21 2021-202 65 184 <br />94001 5.17 5.33 WA-14178 <br />11 8 70 <br />94001 1.35 1.85 local <br />RC2293-F1 311-21 <br />12 110 30 270 <br /> <br />13 100 50 100 900 <br />VARIOUS <br />14 RC2291-L1 309-21 250 250 200 3000 <br />63245 0 1.55 <br />15 RC2197-C1 308-21 150 45 60 1500 <br />10360 0.65 0.75 <br />16 253 240 250 150 3717 <br />63501 3.08 4.35 <br />17 200 80 2500 <br />VARIOUS <br />18 30 0 60 1200 <br />23010 2.25 2.4 <br />19 350 160 890 <br />VARIOUS <br />20 80 60 1500 <br />68910 0 0.57 <br />21 50 20 30 350 <br />VARIOUS <br />22 347 75 193 2119 <br />93526 0.86 0.86 <br />23 96 45 338 <br />22512 0.67 0.67 <br />24 RC1585-F1 285-18 2018-054 275 300 175 1550 <br />93075 0 0.68 <br />25 300 200 <br />40315 0.13 0.25 <br />Construction Jobs preformed by Maintenance Crew (County Force Work) <br />26 60 65 975 <br />69370 5.79 11.64 Local <br />27 15 50 635 <br />10431 0 2.04 Local <br />28 RC1583-G1 286-18 2018-054 25 0 25 150 <br />Parke Creek Road Turnaround <br />1100Pheasant Lane Turnaround <br />700BRAC <br />Airport Road Culvert Replacement <br />1290Badger Pocket Road HMA <br />1640Lambert Road Br 06345 Maintenance <br />479BRAC <br />HSIP 2025 awarded project HSIP 450Short Span Bridge Replacement - Phase 1 <br />1400Sanders Road Improvements <br />500 2300 <br />Bender Road Widening and Pedestrian Improvements 2673HSIP 2023 awarded project <br />1150Yellowstone Culvert Replacement <br />1755HSIP <br />STBG <br />Cooke Canyon Bridge Replacement - Const by 25 <br />Vantage Hwy over Cascade Canal (89342) Replacement <br />249Denmark Road Improvement (4014 requested with RAP)4610STBG <br />RAP <br />Badger Pocket Area Road Improvements Phase 2 2780Intersection and Corridor Safety Improvements <br />382Bridge Rail Improvements Code 3 Phase 1 (MD A-F)601Airport Road Sidewalk Replacement <br />RAP <br />BRAC <br />Progress Path Ph2 - Cle Elum <br />Safe Rts to Schools 410HSIP <br />Hungry Junction Road Widening 4101Full Funding not till 2024 <br />Badger Pocket (PAYNE RD) Improvement <br />3700RAP <br />HSIP <br />Reecer Creek Rd Bridge over Town Ditch Replacement - Bridge Only <br />2734Faust Road Bridge over Town Ditch Replacement - const by 25 BRAC 2532Dickey Creek Bridge (16203) Replacement FHWA project <br />400I-90 Widening (State project)7502028 <br />KITTITAS COUNTY <br />2023-2028 <br />SIX YEAR TRANSPORTATION IMPROVEMENT PLAN <br />1700Liberty Rd Swauk Creek Bridge <br />3207programmed for CN 2024 <br />FLAP <br />FLAP <br />2023 2024 2025 2026 2027 <br />78Bar 14 Turnaround <br />2001 of 2
The URL can be used to link to this page
Your browser does not support the video tag.