My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Performance Bond A312-2010
>
Meetings
>
2022
>
12. December
>
2022-12-06 10:00 AM - Commissioners' Agenda
>
Performance Bond A312-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 11:50:11 AM
Creation date
12/12/2022 11:50:03 AM
Metadata
Fields
Template:
Meeting
Date
12/6/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Boards Signature on the AIA Contract with Concord Construction for the Bloom Addition
Order
6
Placement
Consent Agenda
Row ID
96854
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$ 10 l?tc Surcty shall nct be llablo to tbe Orrner! Claimants or ofhers for obligations of the Contractor that are uffslated to dro Constuotion Contraot <br />Thc Orvner shall uot be liable fol thepayment of any casts or e$enaes of auy Claioad under &is Bond, and sholl baye under this Bond no <br />obligation to make payrnents tq or give notice on behalf o{ Claimauts or olherwise have any obligations to Claimants under ihis Bond. <br />$ 1 1 The Surety hereby waives notice of any change, includbg changes of time, to tte Constr:ction Contract cr to rolated subcontrcts, ;rurchase <br />orders and other obligations, <br />$ 't2 No sult or action shall be comcuccd by a Clalmaut under this Bond othetthan in acourtofcrirpotentjurisdiotion in the state in which the <br />project that is ihc subjccl ofthe Construction Corlracfls located or a0er the expiration ofone year &om the date (1) onri,hich ttc Claimart scnt a <br />Claim to the Surcty pursuant to Scstloo 5. I J or 5.2, or (2) oa which the lasi labor or seryice was performed by anyone or thc iast materials or <br />equipmentwcrc firmisbed by anyone under the ConstruotionContacf whichever of(l) or(2) fint occurs. Ifthc pmvlslons ofthis Paragraph arc void <br />orprohibited by law, tbe ninimum period oflimitation available to sureties as a defense is thejurisdicttoo ofthe suit shall be applicable. <br />$ 13 Notlce aad Claims to the Surety, the Orvneror the Coatractorsballbemailcd ordeliwred to lhe address shown oatlrgpage onwhich their <br />sigrature appears. Actual r€ceipt ofnotics or Claimq holvcvcr acconplishe{ shall be sufficient cornpliance as ofthe date received. <br />$ 14 Wben this Bond has bccn tmlshcd lo cqmply wi& a statutory or other legal requirement ln the location wbere lhe consFuction was to be <br />perfotmed, any provision iu this Bond conflictlng with said statutory or legal requirement shatl be deemed deleted hersftom and provisions <br />conforming to sush stahrtory or other legal requirenent shall be deemed incorporaled hersin. When so furnishcd, tts ident is that this Bond shall be <br />conskucd as a statutory bond and not as a common law bond. <br />$ 16 Upon request by any person or entity appearing !o be a potential bcneficiary ofthis Bon4 &e Coilractor and O*ner shall pmmptly furnish a <br />copyofthisnond orshallpermit a copy to bemadc. <br />g'16 Deflnitions <br />$ 16.1 Claim. A written statement by the Claimantincluding at a minimum: <br />,'l the name of the Claimang <br />.2 the namo of the person for rvhom the labor was done, or natarials or equlpment firnlshe4 <br />'3 a copy of tbc agrccment orlurchase orderpurs:ant to which labor, materials or equiprnent nas furnished foruseh the <br />perforrnance of the Corstruction Contractg <br />.4 a brief desoiptlon of the labor, materials or equipment firmisled; <br />.5 the date on which the Claimant last performed labor or tast fumjshsd materlals or equipment foruse in lhe performance ofthe <br />Construction Conlrao! <br />,5 the total amount car:red by the Clalnant for labor, materials or eguipnent fumished as of the date of the Claim; <br />,7 tte total amount ofprcvious paymcnts teceived by the Clalraadt; and <br />.8 the total amount duo and unpaid to &e Claimant forlabor, matedals or equlpment flrrnlshed as ofths date of the Claim. <br />$ I 6.2 Clairnant. .& individual or erdity having a direct contract with the Conkactor or rvith q subconhactor ofthe Contractor to fltnish labor, <br />rnaterials or equipment for use in &e perfonnance of the Conskuetion Contract lhc tern Claimatt also includes any individual or entity that has <br />rightfully asserted a claim under an applicable mcchanlc's lien or similarstatuti agaiast the real properlyupon rvbicb the Project is locaied, The Intent <br />of this Bond shali be to include without limitaHon ia thc terms "labor, materials or equipmenf' tJrat part of water, gas, porver, lighl hea! oil, gasoline, <br />telephone service or rcntal cquipmcnt used in the Conshuctioa Contracf arohitectual artd engineering services reqr:ired forperformance ofths rvork <br />of the Contractor and the Contrastotrs subconkactors, anil all other items for which a meohanic's lien may be asserted in thc jurisdlctioa where thc <br />labor, materials or equipment rvere firrnished, <br />$ 16,3 constructlon Contract. Tho agreement betweel the Oryner and Conhactoridcntificd onthc coverpage, inoluding all Contract Documents <br />and all changes made to the ggreemetrt ond the ConbqctDocuments, <br />s-21491AS 8/10
The URL can be used to link to this page
Your browser does not support the video tag.