Laserfiche WebLink
$ 'l The Contractor and Surcty, jointly and severally, bind thernselves, their heirs, atecutors, adminislrators, successo$ and assigns to thc Owncr to <br />lay for labor, materials and equipment lumished for use in the performance ofthe Conskuotiodr ConBacf, vhich is incorporatcd herein by feference, <br />subject to the lollowing terms, <br />g 2 If the Contractorpromptly mukes puyment ofall sums duc to Clatnatts, and dofcnds, indemnifies and holds harnless the Owrer tom claLns, <br />demands, liens orsuits by any penon orentlg seekingpaynrent forlabor, matcrials orequipment ftrnished for uso in the performance oflhe <br />Construction Contract, thcn thc Surcty and thc Conhactor shall have no obligation under this tsond. <br />$ 3 If there is no OrvnerDefault under the Construction Contract, thc Suray's obligation to the Owner uuder this Eond shall arise afferthe Owner <br />has promptly notilicd thc Contractor and thc Surcty (at thc address described in Secdon 13) ofclaims, demands, Iiens or sults againsttho Owner or <br />the bwner'sproporty by any person or entiry seoking payment for labor, materials or equipment ffrmished for use in the performance oflhe <br />Constnrction Contract ard tcdffsd dofsise of such clalms, demands, liens or suits to the Contrctor atld tbe Surety. <br />$ 4 When the Owner has satisfied the conditions in Section 3r lhe Surety shall promptly md at the Suretyrs expcnse dcfcnd indcm-ni$ aad hold <br />hannless the Owncr against aduly tendercd claim, demand, Iien or suit. <br />$ 5 The Surer/s obligations lo a Claimant uuderthis Bond sholl arise after the follorving: <br />$ 5.1 Claimants, who do not have a direct conhact with the Contractor, <br />.1 have fumished auritten notice ofnon-paymenf to tlre Con!:actor, statilgwith substantial occuraoy thc anount alaimed atrd the <br />name olthe party to whom the materials were, or eguipmcnt was) fi$Eishcd or supplicd orforlvhod thc labolwas done or <br />performe<i, within ninety (90) days aftcr haviag last performed labor or last firmlshed malcrials or equipnenl ldcluded ln the Claim; <br />and.2 havs scnt a Claim to thc Surcty (at thc address described in Section 13). <br />g 6.2 Claimants., who arc cmploycd by or havc a dircct contract with the Conhactor, have sent a Claim to the Surety (rt the address described in <br />Seotion l3). <br />g 5 Ifa notice oftron-paymenr required by Sectioa 5,1.1 is glven by the Owner to the €ontraetor, that is sufficient to satisfy a Cluimant's obligation <br />to furnish a r*ritten notice ofnon-paymentunder Section 5.1'1. <br />g 7 lVhen a Claimanthas satlsfied the couditions of Sections 5,1 or 5.2, whichever is applicablg the Surety shall promltty anrl at fte Swely's <br />expense take the follorving actionsl <br />$ 7.1 Send an answer to the Claimanl rvith a copy to the Orvner, within sirty (60) duys after receipt of thc Claim' striting lhc amounts that ars <br />undisputed and tho basis for challenging any amounts that are disputed; and <br />S 7.2 Pay or anange forpaymentof any mdisputed amounts. <br />$ 7"3 The Suregts failure to discharge its obligotions uuder Ser,tion ?,I or Seetion 72 shall not bc dccrncd to constitute a lvoiver ofdefenses lhe <br />Surrty or Contractof may have or acquire as to a Claim, except as to undisprrted urouns forwhich thc Surcty and Claimant have r€ached agrcefient, <br />I4 however, the Surety iails to discharge its obligations uodcr Scction 7.1 or Scction 7,2, the Surety shalt tndennify the Claimant for the reasonable <br />nttomey's f,ees thc Clainrant iucuts thereafter to rscover any sums fouad to he due and owing to the Claimant. <br />$ 8. The $urely's tota! obligation shall not exceed the amount of ftis Bond, plus lhe amounl ofruasonable attomey's fees provitlcd undcr Scction ?3; <br />and the amount of this Bond shal! be credi(ed for ony paymcnls made in good faitb by lhe Surety. <br />$ I Amounts rirved by the Owner to the Conb:actor undcr lho Construction Contract shall be used for the performance of the CodsUuciion. C0trtract <br />iod to satisfy claims,if any, uudcr any construction performance bond, By lhe Coutractor furnishing aod the Owner accepting this Bond, ihey agree <br />that all firnds camcd by tho Cont'actor in the performance ofthe Construction Contract arc dedicated to satisff obligations oft!€ Corkartor and <br />Surcty under lhis 3on4 subject to the Olvneds priority to use the funds for thc completion ofthe work. <br />s-2149/AS 8/10