My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Liabiltiy Insurance
>
Meetings
>
2022
>
12. December
>
2022-12-06 10:00 AM - Commissioners' Agenda
>
Certificate of Liabiltiy Insurance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 11:45:46 AM
Creation date
12/12/2022 11:45:34 AM
Metadata
Fields
Template:
Meeting
Date
12/6/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Boards Signature on the AIA Contract with Concord Construction for the Bloom Addition
Order
6
Placement
Consent Agenda
Row ID
96854
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J AIasIeNational <br />!NSURANCE COMPANY <br />B. For all sums which the insured becomes legally <br />obligated to pay as damages caused by <br />"occurrences" under Section I - Coverage A, and <br />for all medical expenses caused by accidents <br />under Section I - Coverage C, which cannot be <br />attributed only to ongoing operations at a single <br />designated construction project shown in the <br />Schedule above: <br />1. Any payments made under Coverage A for <br />damages or under Coverage C for medical <br />expenses shall reduce the amount available <br />under the General Aggregate Limit or the <br />Products-completed Operations Aggregate <br />Limit, whichever is applicable; and <br />2. Such payments shall not reduce any <br />Designated Construction Project General <br />Aggregate Limit. <br />C. When coverage for liability arising out of the <br />"products-completed operations hazard" is <br />provided, any payments for damages because of <br />"bodily injury" or "property damage" included in the <br />"products-completed operations hazard" will <br />reduce the Products-completed Operations <br />Aggregate Limit, and not reduce the General <br />Aggregate Limit nor the Designated Construction <br />Project General Aggregate Limit. <br />D. lf the applicable designated construction project <br />has been abandoned, delayed, or abandoned and <br />then restarted, or if the authorized contracting <br />parties deviate from plans, blueprints, designs, <br />specifications or timetables, the project will still be <br />deemed to be the same construction project. <br />E. The provisions of Section lll - Limits Of lnsurance <br />not otherwise modified by this endorsement shall <br />continue to apply as stipulated. <br />This endorsement changes the policy to which it is attached and, unless otherwise stated, is effective on the date <br />issued at 12:01 A.M. standard time at your mailing address shown in the policy. The information below is <br />required only when this endorsement is issued subsequent to commencement of the policy. <br />Endorsement Effective Policy No. <br />lnsured Endorsement No. 21 <br />Countersigned By <br />@ lnsurance Services Office, lnc., 2008 <br />Quote Producer CopycG 25 03 05 09 Page 2 of 2
The URL can be used to link to this page
Your browser does not support the video tag.