My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES-2022-171
>
Meetings
>
2022
>
09. September
>
2022-09-06 10:00 AM - Commissioners' Agenda
>
RES-2022-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:17:34 PM
Creation date
9/13/2022 12:17:30 PM
Metadata
Fields
Template:
Meeting
Date
9/6/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Replacement of Bridge No. 88212 on Faust Road over Town Ditch CRP 316-22
Order
14
Placement
Consent Agenda
Row ID
93293
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date <br />812912022 <br />Project Title <br />Faust Road over Towne DitchAgency <br />Kittitas CountY Public Works <br />construction Project. <br />proJ <br />thelnlnvolved ProjectStructuresandExistingMajororutilofRelocationAdjustmentsityDescription <br />theafterinstallandectthenthetopermanentrelocatetoprlorbewilltemporarilvtilitiesUrequired <br />Ri ht of <br />fl night of way Needed <br />n llo Relocation flRetocation Required <br />E uo Right of WaY Needed <br />* All construction required bY the <br />contract can be accomPlished <br />within the existing right of waY. <br />RailroadUtilities <br />E Uo railroad work required <br />l-lnt railroad work will be completed prior to the start of <br />- the construction contract <br />l-lnt the railroad work will be completed <br />- with the construction contract <br />in coordination <br />n llo utility work required <br />Mrut utilitv work will be comPleted <br />- of the cbnstruction contract <br />l-1nt utilitv work will be completed <br />- with th6 construction contract <br />prior to the start <br />in coordination <br />FM lnvolvement <br />ls any airPort located within 3.2 kilometers miles)of the proposed P n Yes M ruo <br />Remarks <br />This project h as been reviewed bY the legislative bodY of the administration agencY or agencies, or it's <br />designee, and is not inconsistent with the hensive plan for community development <br />DaEaqlcu/ex <br />Ag <br />By <br />Mayor/Chairperson <br />DOT Form 140-101 <br />Revised 0'112022 Previous Editions Obsolete <br />Page 3
The URL can be used to link to this page
Your browser does not support the video tag.