My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES-2022-171
>
Meetings
>
2022
>
09. September
>
2022-09-06 10:00 AM - Commissioners' Agenda
>
RES-2022-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:17:34 PM
Creation date
9/13/2022 12:17:30 PM
Metadata
Fields
Template:
Meeting
Date
9/6/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Replacement of Bridge No. 88212 on Faust Road over Town Ditch CRP 316-22
Order
14
Placement
Consent Agenda
Row ID
93293
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date <br />812912022 <br />Project Title <br />Faust Road over Towne DitchAgency <br />Kittitas County Public Works <br />ed WorkofP <br />Number of Lanes <br />2 <br />Roadway Width <br />32 <br />Project Type (Check all that Apply) <br />E ttew Construction n Path /Trail <br />! Reconstruction I Pedestrian / Facilities <br />! Raitroad ! Parking flotner <br />3-R <br />2-R <br />M ario <br />Geometric Desi n Data <br />Grossroadh RouteThroDescription <br />! urnan <br />I Rural <br />n ruHs <br />fl Principal Arterial <br />fl tvtinor Arterial <br />flcoltector <br />fltrlajor collector <br />flVinor Collector <br />fl tocatAccess <br />! uroan <br />E Rurat <br />n ruHs <br />! erincipalArterial <br />! rrlinorArterial <br />n collector <br />n Uajor Collector <br />! tvtinor Collector <br />[Z tocalAccess <br />Federal <br />Functional <br />Classification <br />MountainFlatMountainrlat [Z RottTerrain <br />35Posted S <br />35Design Speed <br />100Existing ADT <br />100Design YearADT <br />2022Design Year <br />Desig n Hourly Volume (DHV) <br />Performance of Work <br />Agency <br />50 <br />Others <br />50 <br />Preliminary Engineering Will Be Performed By <br />between consultant and agencYsplit <br />Agency <br />ohofto <br />Contract <br />100 <br />Construction Will Be Performed BY <br />contract <br />Environmental Classification <br />n Ctass I - Environmental Impact Statement (ElS) <br />fl Project lnvolves NEPA/SEPA Section 404 <br />lnteragencY Agreement <br />n Ctass lll - EnvironmentalAssessment (EA) <br />! Project lnvolves NEPA/SEPA Section 404 <br />E CIass ll - Categorically Excluded (CE) <br />f] Projects Requiring Documentation <br />(Documented CE) <br />lnteragen Agreements <br />work over irrigation canal will be performed while canal system is not in service between November and <br />Environmental Considerations <br />April. <br />01 <br />Revised 0112022 Previous Editions Obsolete <br />Page
The URL can be used to link to this page
Your browser does not support the video tag.