Laserfiche WebLink
Project Title Date <br />Agency Cooke Canyon over HiLine Can 8/29/2022 <br />Krttitas County Public Works Y <br />Right of Way <br />✓� No Right of Way Needed ❑Right of Way Needed <br />* All construction required by the ❑ No Relocation ❑ Relocation Required <br />contract can be accomplished <br />within the existing right of way. <br />Utilities Railroad <br />❑ No utility work required ✓0 No railroad work required <br />✓� All utility work will be completed prior to the start ❑ All railroad <br />construction rlte contract mpleted prior to the start of <br />of the construction contract <br />❑ All utility work will be completed in coordination ❑ All the railroad work will be completed in coordination <br />with the construction contract with the construction contract <br />Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project <br />Utilities will be required to temporarily relocate prior to the project and then install permanent after the <br />construction project. <br />FAA Involvement <br />Is any airport located within 3.2 kilometers (2 miles) of the proposed <br />Remarks <br />[:]Yes W✓ No <br />This project has been reviewed by the legislative body of the administration agency or agencies, or its <br />designee, and is not inconsistent with the agency's comprehensive plan for community development. <br />Agency <br />Date By Mayor/Chairperson <br />Page 3 <br />DOT Form 140-101 Previous Editions Obsolete <br />Revised 01/2022 <br />