My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_CookeCanyonRoad_Prospectus
>
Meetings
>
2022
>
09. September
>
2022-09-06 10:00 AM - Commissioners' Agenda
>
Resolution_CookeCanyonRoad_Prospectus
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2022 1:10:39 PM
Creation date
9/1/2022 1:10:12 PM
Metadata
Fields
Template:
Meeting
Date
9/6/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Replacement of Bridge No. 80181 on Cooke Canyon Road over the Hiline Canal CRP 315-22
Order
15
Placement
Consent Agenda
Row ID
93293
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />Kittitas County Public Works <br />Project Title <br />Cooke Canyon over HiLine Canal <br />Date <br />8/29/2022 <br />osed Work <br />1 <br />all that Apply) <br />dway Width <br />Number of Lanes <br />ruction ❑Path/Trail <br />7FD�Newconstruction <br />q2-R <br />2tion <br />] <br />❑ Pedestrian / Facilities <br />❑ Parking <br />Z✓ Bridge <br />Geometric Design Data <br />Description <br />Crossroad <br />Arterial <br />❑ Principal Arterial <br />Federal <br />erial <br />=Rural <br />❑ Minor Arterial <br />❑ Urban <br />❑ Collector <br />Functional <br />E]ElMajor Collector <br />❑Rural <br />E] Major Collector <br />Classification <br />El F1Minor Collector <br />NHS <br />❑ Minor Collector <br />✓❑ Local Access <br />❑ Local Access <br />Terrain <br />❑✓ Flat ❑ Roll ❑ Mountain <br />❑ Flat ❑ Roll ❑ Mountain <br />Posted Speed <br />50 <br />Design Speed <br />50 <br />Existing ADT <br />268 <br />Design Year ADT <br />268 <br />Design Year <br />2022 <br />Design Hourly Volume (DHV) <br />Performance of Work <br />Preliminary Engineering Will Be Performed By <br />Others <br />Agency <br />shared agency and consultant <br />50 % <br />50 % <br />Construction Will Be Performed By <br />Contract <br />Agency <br />contract <br />100 % <br />% <br />Environmental Classification ��J <br />❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE) <br />❑ Project Involves NEPA/SEPA Section 404 El Projects Requiring Documentation <br />Interagency Agreement (Documented CE) <br />❑ Class III - Environmental Assessment (EA) <br />❑ Project Involves NEPA/SEPA Section 404 <br />Interagency Agreements <br />Environmental Considerations <br />work over irrigation canal will be performed while canal system is not in service between November and <br />April <br />Page 2 <br />DOT Form 140-101 Previous Editions Obsolete <br />Revised 01/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.