My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bowers Field_SOQ_Engineering Services
>
Meetings
>
2022
>
09. September
>
2022-09-06 10:00 AM - Commissioners' Agenda
>
Bowers Field_SOQ_Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2022 1:10:45 PM
Creation date
9/1/2022 1:10:10 PM
Metadata
Fields
Template:
Meeting
Date
9/6/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Notice of a Request for Qualifications for Engineering and Planning Services at Bowers Field for 2023-2027
Order
10
Placement
Consent Agenda
Row ID
93293
Type
Hearing notice
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/29/22,10:03 AM newspaper -text (36).html <br />Public Notice <br />Kittitas County, Ellensburg WA <br />REQUEST FOR STATEMENT OF QUALIFICATIONS <br />For Consulting Services Relating to Civil Engineering Design/Construction Support and Aviation Planning Services <br />Implementing the 2023 — 2027 Bowers Field Airport Capital Improvement Plan <br />All submittals received after 10:00 AM Friday October 14, 2022, will be discarded. <br />PURPOSE: <br />Kittitas County is requesting Statement of Qualifications (SOQ) from qualified professionals for on-call consulting services <br />relating to Civil Engineering Design/Construction Support and Aviation Planning Services implementing the 2023-2027 <br />Bowers Field Airport Capital Improvement Plan. The on-call task order contract will be for five (5) years (2023 — 2027). <br />The County anticipates needing services of consultants with expertise in the following areas: <br />• Civil Engineering Design <br />• Construction Management <br />• Quality Control and Assurance <br />• Material Testing <br />• Aviation Planning Services (ALP, ACIP and Land Use Planning) <br />SCOPE OF PROJECT: <br />1. Civil Design and Construction Management <br />The consultant must be able -to provide civil engineering design services meeting Federal Aviation Design standards, <br />construction management support services and professional staff for aviation planning services to Kittitas County. These <br />services may include but are not limited to taxiway design, runway rehabilitation design, taxi -lane design, airport lighting <br />design, stormwater runoff control, airport pavement markings and signage. The selected consultant/consultants may also <br />provide aviation planning support services including, but not limited to Master Plan Updates and other updates to airport <br />operational plans. Responders may reply to both services or target a single service in response. <br />The consultant providing construction support services must demonstrate competence and qualifications related to the <br />services performed including: <br />1. Successful experience designing airport improvements pursuant to current Federal Aviation Administration (FAA) <br />design standards. <br />2. Proven experience producing FAA construction specification packages. <br />3. Possess a strong knowledge and understanding of Federal Aviation Administration rules. Regulations and <br />Informational Circulars. <br />4. Successful experience in evaluating development proposals in areas where streams, rivers, wetlands, and endangered <br />species exist. <br />5. Successful experience supporting local agencies manage FAA grant funded construction projects. <br />6. Ability to respond to unexpected as well as regularly scheduled requests for services with minimal delay. <br />7. Ability to work collaboratively in a regulatory environment with other agencies, interest groups, and permit <br />applicants. <br />8. Proven skill in project and stakeholder management. <br />2. Planning Services <br />The consultant must be able to provide a variety of community planning services to Kittitas County including but not limited <br />to: expertise implementing the Growth Management Act, code amendments, urban and rural design, airport overlay zones, <br />community education and coordination, economic development, transportation planning, development review capabilities, <br />GIS support, and project scheduling and coordination experience. <br />The successful planning consultant must demonstrate competence and qualifications related to the services performed <br />including: <br />file:///C:/Users/randle.leader/Downloads/newspaper-text (36).html 1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.