My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-08-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2022
>
09. September
>
2022-09-06 10:00 AM - Commissioners' Agenda
>
2022-08-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2022 1:10:46 PM
Creation date
9/1/2022 1:10:07 PM
Metadata
Fields
Template:
Meeting
Date
9/6/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
93293
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ NPDES Updates <br />■ Stormwater Site Plan <br />■ Grading Plan <br />Assumptions <br />• One site visit for the archeological assessment and hazard assessment is anticipated to be attended <br />by two Jacobs staff. <br />• Up to two one-hour virtual agency meetings will be held and attended by up to two Jacobs staff. <br />• The permit tracker will be used to reduce or increase the permitting scope and budget, if needed, <br />after agency input is received on the development of this project. <br />• There will be no historic buildings or structures to be recorded. <br />• Jacobs will address one round of comments from Kittitas County on draft reports. <br />• Jacobs will address one round of comments from reviewing agencies. <br />• Permit deliverables will be provided electronically. <br />• KCSW will be responsible for all permit fees. <br />• Tribal consultation will not be required. <br />• Air quality or noise analysis will be not be required. <br />• Project construction and operation will not affect floodplains, Crystal Creek, wetlands, or other <br />aquatic resources buffers; therefore, no Clean Water Act permitting will be required. <br />• No endangered species or critical habitats will be identified. <br />• A Critical Areas report will not be required. Additional budget will be needed if impacts to critical <br />areas are required. <br />• No more than two Shovel Test Pits required during archaeological site visit. <br />• No more than one archaeological site/isolate identified. <br />• Kittitas County will provide existing geotechnical and groundwater monitoring information and the <br />information will be sufficient to support engineering and permitting purposes. <br />• Washington Department of Ecology Permitting will not be required. <br />• Modifications to the solid waste permit will not be required. <br />• Public outreach and community meetings will not be required. <br />• Federal permitting or National Environmental Policy Act (NEPA) will not be required. <br />• Kittitas County Site Development Permit will not be required. <br />• Agency review can be initiated with 60% Design drawings. <br />• Pre -application conferences can be initiated with the layout finalization presentation from Task 010. <br />• WSDOT permitting efforts will not require Intersection Control Evaluation or assessment of non - <br />motorized modes (bikes and pedestrians) or transit. <br />• No Right of Way acquisition will be required for new entrance. <br />Task 040 — Replacement Scale Specification <br />Jacobs will meet with Kittitas County to discuss replacement scale criteria. Jacobs will develop a scale <br />specification. Jacobs will perform the following work under this task: <br />• Attend two one-hour long virtual meetings with KCSW to align on replacement scale criteria. <br />• Contact up to two scale vendors and provide specification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.